A brief minutes for today's meeting:
https://drupal.star.bnl.gov/STAR/comp/qa/pwg-qa/run-22-qa
1. For 19.6 GeV QA:
1). The plotting for QA procedure need to be updated. As the dashed line/grey
band seems not represent the real QA results.
2). It is important that runs marked as bad after QA procedure are really
problematic, not randomly fall out of the QA regions due to statistic
fluctuations.
3). It will be very helpful for calibration purpose to know the impact of
sDCAxy on physics, like correlation or fluctuation analysis.
4). There are differences on the same QA study by Ashik and Li-ke Liu, need
to get resolved.
2. FXT data will start production in several weeks. Different working groups
need to consider the variables and cuts that will be used in QA.
3. For bad run maker,
1). It should reflect the conditions from different sub-system (see pages
made by Rongrong: https://drupal.star.bnl.gov/STAR/pwg/common/bes-ii-run-qa);
2). Can setup the code using the current bad run list, like the injection
runs from 19.6 GeV.
4. For the Run22, offline QA, different working groups need to think about
this, especially Spin group.
Best,
Ting
> -----原始邮件-----
> 发件人: "Ting Lin" <tinglin@sdu.edu.cn>
> 发送时间: 2021-11-11 07:51:39 (星期四)
> 收件人: "star-qaboard-l@lists.bnl.gov" <star-qaboard-l@lists.bnl.gov>
> 抄送:
> 主题: QA Board Meeting Nov 12
>
> Hi all:
>
> Thank you to those who participated in trying to select a new time for this
> meeting. Unfortunately, there was not a time slot that would work for
> everyone. So I think we will continue to have meeting at noon on Friday BNL
> time, and see how it goes as Run22 starts.
>
> We will have a QA board meeting at noon this Friday. The main agenda is the
> progress on BES-II data QA.
> https://drupal.star.bnl.gov/STAR/comp/qa/pwg-qa/run-22-qa
>
> Thanks,
> Ting
-
[STAR-QAboard] QA Board Meeting Nov 12,
Ting Lin, 11/10/2021
-
Re: [STAR-QAboard] QA Board Meeting Nov 12,
vipul, 11/11/2021
- Re: [STAR-QAboard] QA Board Meeting Nov 12, Ting Lin, 11/11/2021
- Re: [STAR-QAboard] QA Board Meeting Nov 12, Liu, Xiaoyu, 11/11/2021
- Re: [STAR-QAboard] QA Board Meeting Nov 12, Ting Lin, 11/12/2021
- <Possible follow-up(s)>
-
Re: [STAR-QAboard] QA Board Meeting Nov 12,
likeliu, 11/12/2021
-
Re: [STAR-QAboard] QA Board Meeting Nov 12,
ashik, 11/12/2021
- Re: [STAR-QAboard] QA Board Meeting Nov 12, Ting Lin, 11/12/2021
-
Re: [STAR-QAboard] QA Board Meeting Nov 12,
ashik, 11/12/2021
-
Re: [STAR-QAboard] QA Board Meeting Nov 12,
vipul, 11/11/2021
Archive powered by MHonArc 2.6.24.