star-tpc-l AT lists.bnl.gov
Subject: Star-tpc-l mailing list
List archive
- From: "Van Buren, Gene" <gene AT bnl.gov>
- To: Star-tpc L <star-tpc-l AT lists.bnl.gov>
- Subject: [[Star-tpc-l] ] GirdLeak wall voltages
- Date: Tue, 24 Sep 2024 19:00:00 +0000
Hi, TPC-ers
I was glad to see a note posted in the ShiftLog minutes ago that David Tlusty
has restored voltage to the GridLeak Wall for two sectors that would not
retain voltage starting yesterday!
https://online.star.bnl.gov/apps/shiftLog/logForEntry.jsp?ID=95004
Original issue reported here:
https://online.star.bnl.gov/apps/shiftLog/logForEntry.jsp?ID=94932
and here:
https://online.star.bnl.gov/apps/shiftLog/logForEntry.jsp?ID=94938
I hope David can provide some insight to us on what exactly failed and how he
remedied it. As I told Alexei over the phone yesterday, I was surprised to
hear of two failing within time proximity of each other. Thanks go out to
Alexei and Jim for some efforts to get the voltage back before David tried.
There will be some work to do to determine if the zeroed GirdLeak Wall
voltages allowed any perceptible leakage of ions, but as long as this doesn't
come back soon, I can take a little more time to answer this.
Thanks,
-Gene
-
[[Star-tpc-l] ] GirdLeak wall voltages,
Van Buren, Gene, 09/24/2024
- Re: [[Star-tpc-l] ] GirdLeak wall voltages, Van Buren, Gene, 09/24/2024
Archive powered by MHonArc 2.6.24.