[[Star-tpc-l] ] Fw: report on LV issues and repairs for TPX and iTPC
- From: "Camarda, Timothy" <tcamarda AT bnl.gov>
- To: Star-tpc L <star-tpc-l AT lists.bnl.gov>
- Subject: [[Star-tpc-l] ] Fw: report on LV issues and repairs for TPX and iTPC
- Date: Tue, 4 Feb 2025 16:38:49 +0000
Hello All,
I made a report to summarize the LV failures and corrective actions that have been taken for the TPX & iTPC repairs over the past years of operation…Most of the LV issues are with the iTPC but we did have a few with the outer sectors.
I tallied the repairs for run 24 and we have ~40% or so from failures of the LV disconnect at the detector end. But, this was typical for repairs from the past recent years of operation.
Best Regards,
Tim
Attachment:
iTPC&TPX_power_cabling_issues_REV1.pdf
Description: iTPC&TPX_power_cabling_issues_REV1.pdf