Skip to Content.
Sympa Menu

usatlas-hllhc-l2deputymgmt-nsf-l - [Usatlas-hllhc-l2deputymgmt-nsf-l] risk slides in L3 talks back-up material

usatlas-hllhc-l2deputymgmt-nsf-l AT lists.bnl.gov

Subject: U.S. ATLAS HL-LHC Upgrade Level 2 and Deputies-NSF only Management Mailing List

List archive

Chronological Thread  
  • From: Gustaaf Brooijmans <gusbroo AT nevis.columbia.edu>
  • To: "Usatlas-hllhc-l2deputymgmt-nsf-l AT lists.bnl.gov" <Usatlas-hllhc-l2deputymgmt-nsf-l AT lists.bnl.gov>
  • Subject: [Usatlas-hllhc-l2deputymgmt-nsf-l] risk slides in L3 talks back-up material
  • Date: Wed, 17 Jul 2019 09:58:48 +0200


Hello all,

Since the risk register is difficult to read, please add the risk slides to the back-up of the L3 talks (one per risk, all risks, incl. revised versions of the summary slides at the beginning). Make sure to use the NSF logo - the template we had sent out for these used the DOE logo.

Best,

Gustaaf



  • [Usatlas-hllhc-l2deputymgmt-nsf-l] risk slides in L3 talks back-up material, Gustaaf Brooijmans, 07/17/2019

Archive powered by MHonArc 2.6.24.

Top of Page