usatlas-hllhc-l2deputymgmt-nsf-l AT lists.bnl.gov
Subject: U.S. ATLAS HL-LHC Upgrade Level 2 and Deputies-NSF only Management Mailing List
List archive
[Usatlas-hllhc-l2deputymgmt-nsf-l] NSF review talks and contingency
- From: Gustaaf Brooijmans <gusbroo AT nevis.columbia.edu>
- To: "Usatlas-hllhc-l2deputymgmt-nsf-l AT lists.bnl.gov" <Usatlas-hllhc-l2deputymgmt-nsf-l AT lists.bnl.gov>
- Subject: [Usatlas-hllhc-l2deputymgmt-nsf-l] NSF review talks and contingency
- Date: Thu, 15 Jul 2021 18:57:01 +0200
Hello all,
Two important recommendations from the director's review were to show costs without the covid BCPs and show the float numbers.
Attached is a new contingency simulation file that includes both a tab that includes the covid BCPs (ie what was shown at the DR) and one where the covid BCP impacts are subtracted.
Best,
Gustaaf
Attachment:
risk_summary_NSF.20210612-nocovid.xlsx
Description: application/vnd.openxmlformats-officedocument.spreadsheetml.sheet
- [Usatlas-hllhc-l2deputymgmt-nsf-l] NSF review talks and contingency, Gustaaf Brooijmans, 07/15/2021
Archive powered by MHonArc 2.6.24.