[[Usatlas-hllhc-l2deputymgmt-nsf-l] ] Enhanced Surface Testing Scope Opportunity
- From: "Evans, Harold G." <hgevans AT iu.edu>
- To: "usatlas-hllhc-l2deputymgmt-nsf-l AT lists.bnl.gov" <usatlas-hllhc-l2deputymgmt-nsf-l AT lists.bnl.gov>
- Subject: [[Usatlas-hllhc-l2deputymgmt-nsf-l] ] Enhanced Surface Testing Scope Opportunity
- Date: Mon, 19 Aug 2024 16:58:49 +0000
Hi all,
We have put together some example text describing the justification for the NSF Scope Opportunity items that you are creating to add to the NSF Scope Contingency and Opportunity log (docdb
#969). This text gives you some options to describe these activities that do *not* imply that we're moving them from Operations to the MREFC. Please use this wording when writing your Impact Statements.
Thanks - Hal (for the PO)
The necessity of doing extensive integration work after US deliverables are installed in their final locations in ATLAS is a substantial risk. This type of risk occurred in the Phase-I NSW and TDAQ upgrade systems, leading to long delays in the inclusion
of these systems in ATLAS data-taking. In order to reduce such risks for the HL-LHC deliverables, we are proposing to increase integration testing of US deliverables on the surface before their installation, where production deliverables can be tested with
external components.
--
------------------------------------------------------ Hal Evans hgevans AT iu.edu Professor of Physics http://hgevans.pages.iu.edu/ Tel: (812)856-3828 Fax: (812)855-5533 253 Swain Hall West Indiana University 727 E. Third St. Bloomington, IN 47405 ------------------------------------------------------