Skip to Content.
Sympa Menu

usatlas-hllhc-l2deputymgmt-nsf-l - [[Usatlas-hllhc-l2deputymgmt-nsf-l] ] thoughts on NSF I&I risk estimates

usatlas-hllhc-l2deputymgmt-nsf-l AT lists.bnl.gov

Subject: U.S. ATLAS HL-LHC Upgrade Level 2 and Deputies-NSF only Management Mailing List

List archive

Chronological Thread  
  • From: "Evans, Harold G." <hgevans AT iu.edu>
  • To: "usatlas-hllhc-l2deputymgmt-nsf-l AT lists.bnl.gov" <usatlas-hllhc-l2deputymgmt-nsf-l AT lists.bnl.gov>
  • Subject: [[Usatlas-hllhc-l2deputymgmt-nsf-l] ] thoughts on NSF I&I risk estimates
  • Date: Fri, 23 Aug 2024 12:00:54 +0000

Hi all,

Thanks for your feedback on the NSF I&I risks. A couple of things have emerged from what you've sent me.

1. We should think carefully about the probability of any new or modified "no enhanced surface integration" risks. Presumably, the probability of these new/modified risks occurring should be quite high since the assumption behind them is that we're *not* doing the surface integration. Even a 100% probability would not be unreasonable - but I'll leave it to you to determine the actual value that best fits your risk.

2. It's very important to include an explanation of how you calculated the impacts for these new/modified risks. I will have to defend these estimates at the Ops review, but won't be able to do so if I don't have any background information.

Let's aim for Monday next week (Aug. 26) to collect the updated risks. Let me know if this is not feasible for you.

Thanks  -  Hal
-- 
------------------------------------------------------
 Hal Evans                             hgevans AT iu.edu
               Professor of Physics
           http://hgevans.pages.iu.edu/
 Tel: (812)856-3828                Fax: (812)855-5533
 253 Swain Hall West               Indiana University
 727 E. Third St.               Bloomington, IN 47405
------------------------------------------------------




Archive powered by MHonArc 2.6.24.

Top of Page