usatlas-hllhc-l2deputymgmt-nsf-l AT lists.bnl.gov
Subject: U.S. ATLAS HL-LHC Upgrade Level 2 and Deputies-NSF only Management Mailing List
List archive
Re: [[Usatlas-hllhc-l2deputymgmt-nsf-l] ] 2025-03-17 JOG Tuts NSF HL-LHC.pptx
- From: Gustaaf Brooijmans <gusbroo AT nevis.columbia.edu>
- To: Michael Tuts <tuts AT pmtuts.net>
- Cc: "usatlas-hllhc-l2deputymgmt-nsf-l AT lists.bnl.gov" <usatlas-hllhc-l2deputymgmt-nsf-l AT lists.bnl.gov>, "Amy Garwood - Nevis Labs (agarwood AT nevis.columbia.edu)" <agarwood AT nevis.columbia.edu>
- Subject: Re: [[Usatlas-hllhc-l2deputymgmt-nsf-l] ] 2025-03-17 JOG Tuts NSF HL-LHC.pptx
- Date: Thu, 13 Mar 2025 15:04:27 +0100
I guess the aim is to remain at very high level. A few minor comments:
-sl 5: how will the effect the base program? Do you mean how ill this affect?
-sl 5: I would say “has not impacted us directly (yet?)” as apparently the cuts that have been sent only represent $250M of the $400M announced. (But maybe that’s DOGE accounting…)
-sl 5: I would remove “but now we see…..”
-sl 6: the Feb CPR is out and we’re back at 0.89 => worth including?
-sl 6: do you mean the “near future”? Obviously they will occur in the future…
Best,
Gustaaf
On Mar 12, 2025, at 03:38, Michael Tuts <tuts AT pmtuts.net> wrote:<2025-03-17 JOG Tuts NSF HL-LHC.pptx>Hi All,Attached are my slides for the JOG scheduled on Zoom on Monday 3/17 – assuming there is no shutdown. I have about 15 min to talk about the NSF scope of the Upgrade (which in the NSF guidance is 7.5 slides), so quite abbreviated. Comments/corrections are welcome.Thanks, Mike
-
[[Usatlas-hllhc-l2deputymgmt-nsf-l] ] 2025-03-17 JOG Tuts NSF HL-LHC.pptx,
Michael Tuts, 03/11/2025
-
Re: [[Usatlas-hllhc-l2deputymgmt-nsf-l] ] 2025-03-17 JOG Tuts NSF HL-LHC.pptx,
Gustaaf Brooijmans, 03/13/2025
- RE: [[Usatlas-hllhc-l2deputymgmt-nsf-l] ] 2025-03-17 JOG Tuts NSF HL-LHC.pptx, Michael Tuts, 03/13/2025
-
Re: [[Usatlas-hllhc-l2deputymgmt-nsf-l] ] 2025-03-17 JOG Tuts NSF HL-LHC.pptx,
Gustaaf Brooijmans, 03/13/2025
Archive powered by MHonArc 2.6.24.