usatlas-hllhc-lartl2l3-l AT lists.bnl.gov
Subject: U.S. ATLAS HL-LHC Upgrade LAr Level 2 and Level 3 Managers Mailing List
List archive
[Usatlas-hllhc-lartl2l3-l] Fwd: [Usatlas-hllhc-l2deputymgmt-nsf-l] FW: Documentation required for NSF Independent Cost Estimate (ICE)
- From: John Parsons <parsons AT nevis.columbia.edu>
- To: "usatlas-hllhc-lartl2l3-l AT lists.bnl.gov" <usatlas-hllhc-lartl2l3-l AT lists.bnl.gov>
- Subject: [Usatlas-hllhc-lartl2l3-l] Fwd: [Usatlas-hllhc-l2deputymgmt-nsf-l] FW: Documentation required for NSF Independent Cost Estimate (ICE)
- Date: Thu, 30 May 2019 17:48:24 -0400
Update from Mike Tuts on the ICE. Now that we are done with the
NSF BCP, we need to return to preparing these docs.
John
-------- Forwarded Message --------
Subject: [Usatlas-hllhc-l2deputymgmt-nsf-l] FW: Documentation required for NSF Independent Cost Estimate (ICE)
Date: Thu, 30 May 2019 21:41:57 +0000
From: Michael Tuts <tuts AT pmtuts.net>
To: Usatlas-hllhc-l2deputymgmt-nsf-l AT lists.bnl.gov <Usatlas-hllhc-l2deputymgmt-nsf-l AT lists.bnl.gov>
Hi All,
As we approach the end of the month, the NSF scope RLS should be updated by the end of this week, which will allow the ICE documentation to be completed soon. The ICE documentation (see old message below) will be required soon. NSF is still evaluating the Army Corps of Engineers/ICE report based on the two original deliverables, so it is not yet clear when they will be ready for the next round of documentation for all remaining deliverables, the current information is that it could be due ~June 15 which NSF views as optimistic at this point. We will update you when we have a more definite date. In the meantime this is my current understanding of your documentation. The numbers shown refer to the DocDB #. If you update documentation, update it in your area and let me know or send it to me directly. I will update the ICE DocDB using your updated files – I say that because I am trying to keep a uniform naming convention for the files.
Cheers, Mike
Below is a summary of the attached excel sheet (“ICE documentation.xlsx”). Send correction if you find errors.
* Project Documentation (needs to be reviewed/updated)
#78 PEP
#4 RMP
#197 CEP
#196 Risk Register
#201 WBS Dictionary – needs to be updated because contains old references to design/R&D which is pre-MREFC and needs to be purged for the WBS dictionary for FDR
P6 XER file
P6 XER file (material costs removed for ICE)
* LAr
#655 WBS 6.04.01 – this is file for ICE Phase-I
#779 WBS 6.04.02 – BOE-NSF needs updating, MISSING: BOE-ICE, Overview-NSF, Overview-ICE, Tech specs
#779 WBS 6.04.03 – BOE-NSF needs updating. MISSING: BOE-ICE, Overview-NSF, Overview-ICE, Tech specs
* TileCal
#691 WBS 6.05.01 – complete but BOE-NSF/ICE needs updating from new RLS-Cobra
#691 WBS 6.05.03 - complete but BOE-NSF/ICE needs updating from new RLS-Cobra, MISSING: Tech Specs
#691 WBS 6.05.04 - complete but BOE-NSF/ICE needs updating from new RLS-Cobra, MISING: Tech Specs
* Muon
#692 WBS 6.06.01 – complete but BOE-NSF/ICE needs updating from new RLS-Cobra
#655 WBS 6.06.03 – use ICE phase information
#692 WBS 6.06.04 - BOE-NSF/ICE needs updating from new RLS-Cobra, MISSING: BOE-NSF
#692 WBS 6.06.05 – MISSING: BOE-NSF/ICE, Overview, Tech Specs
* Trigger
#693 WBS 6.08.01 – complete but BOE-NSF/ICE needs updating from new RLS-Cobra
#693 WBS 6.08.02 – complete but BOE-NSF/ICE needs updating from new RLS-Cobra
*From:* Michael Tuts
*Sent:* Friday, March 29, 2019 7:30 AM
*To:* 'Usatlas-hllhc-l2deputymgmt-nsf-l AT lists.bnl.gov' <Usatlas-hllhc-l2deputymgmt-nsf-l AT lists.bnl.gov>
*Cc:* 'usatlas-hllhc-management-l AT lists.bnl.gov' <usatlas-hllhc-management-l AT lists.bnl.gov>; Amy Garwood <agarwood AT nevis.columbia.edu>
*Subject:* RE: Documentation required for NSF Independent Cost Estimate (ICE)
Hi,
Just in case it is helpful, the way I created the redacted documents was to convert them to pdf and then use the “redact” tool in Adobe Acrobat to make the permanent redactions (you can’t undo the redaction after you save it).
Cheers, Mike
*From:* Michael Tuts
*Sent:* Wednesday, March 27, 2019 11:32 AM
*To:* Usatlas-hllhc-l2deputymgmt-nsf-l AT lists.bnl.gov <mailto:Usatlas-hllhc-l2deputymgmt-nsf-l AT lists.bnl.gov>
*Cc:* usatlas-hllhc-management-l AT lists.bnl.gov <mailto:usatlas-hllhc-management-l AT lists.bnl.gov>
*Subject:* Documentation required for NSF Independent Cost Estimate (ICE)
Hi All,
Please pass this on to L3s and any others that need it. This is a reminder that you should be preparing the documentation for the ICE review, which is asked to arrive at an independent cost estimate of the *_commercially procured costs only_* (so all our material costs but *_not labor_*) – we need that documentation in our hands by April 12, so it can be vetted before forwarding to NSF for ICE. An example of the documentation that has already been provided to the Army Corps of Engineers (ACE) and their expert subcontractors for the two pre-FDR deliverables (Muon TDC, LAr ADC) are available in DocDB #655 (a cut and paste is shown below).
* Some of that documentation is provided by the PO (e.g. CEP, P6 XER
file, PEP, Risk register, WBS dictionary). So this is not your
responsibility.
* The other documentation needs to be provided by you (*BOE, Design
overview for deliverable, technical specifications*). Your
documentation should come in two version – one that is complete (for
NSF) and a version where the material costs have been redacted (for
ICE).
One caveat is that although NSF has agreed that we have provided the documentation we were asked for by them. What we do not know is if this documentation will suffice, so to that end, the ICE committee is reviewing the material this week, and we have a ‘kickoff’ meeting between USATLAS-NSF-ACE/ICE takes place by teleconference on April 9 at 12-2pm eastern. You and your L3s are encouraged to attend to see what is expected by the ACE/ICE.
Connection information for Army Corps kickoff meeting on April 9 12-2pm (eastern)
Below is the webex info:
https://urldefense.proofpoint.com/v2/url?u=https-3A__usace.webex.com_join_simon.fet&d=DwID-g&c=aTOVZmpUfPKZuaG9NO7J7Mh6imZbfhL47t9CpZ-pCOw&r=DSVO6Re8kg14S-cQbkBC2zfSx6Yt2GtkcD3fTWOeyfXXTwIA3TKWV-phDKykUKDr&m=NJ0bXGU6CrmnF0eLy4xYkBPvnrigtmSq2Ch9wDSgZTU&s=24brYFssQONtZhV0Ld-EuJKA7lHYEBtqH2c7LI4OaDw&e= <https://urldefense.proofpoint.com/v2/url?u=https-3A__usace.webex.com_join_simon.fet&d=DwMFAg&c=aTOVZmpUfPKZuaG9NO7J7Mh6imZbfhL47t9CpZ-pCOw&r=Z0wuTxQYnTTMlYma4lGZlO3skeCGVBrGGurYkWbhJsJuG5HaY82rmCNSdFOV7C4Z&m=nWS_TrM5095jMIMRbCKQPBuNH-LN0LNjtgMG9PMPq9M&s=g-RYkXPxpejgmaTeBoD5OFGSnDpy12DYIe7UIleFcIU&e=>
Toll free: 866-434-5269
Long dist: 216-706-7005
Access Code: 4146923
Security Code: 4657
Thanks, PO
*Abstract:***
These are the files requested by NSF to carry out the first phase of the Independent Cost Estimate (ICE). The two systems being reviewed are WBS 6.4.1.1+6.4.1.2 and 6.6.3
*Files in Document:***
* Cost Estimating Plan
<https://atlas-hllhc.docdb.bnl.gov/0006/000655/004/Cost%20Estimating%20Plan%20v2.7b%202019-06-22.pdf>
(Cost Estimating Plan v2.7b 2019-06-22.pdf, 718.1 kB)
* P6 XER File for ICE
<https://atlas-hllhc.docdb.bnl.gov/0006/000655/004/RLS%20US%20ATLAS%20P6%20Material%20and%20Equipment%20Costs%20Removed%202018-12-26%20for%20ICE%20Use.xer>
(RLS US ATLAS P6 Material and Equipment Costs Removed 2...xer, 5.9 MB)
* P6 XER File for NSF
<https://atlas-hllhc.docdb.bnl.gov/0006/000655/004/RLS%20US%20ATLAS%20P6%20Complete%202018-12-28%20for%20NSF%20Use.xer>
(RLS US ATLAS P6 Complete 2018-12-28 for NSF Use.xer, 6.0 MB)
* PEP for ICE
<https://atlas-hllhc.docdb.bnl.gov/0006/000655/004/PEP%20US%20ATLAS%20HL-LHC%202019-01-16%20Redacted%20for%20ICE%20Use.pdf>
(PEP US ATLAS HL-LHC 2019-01-16 Redacted for ICE Use.pdf, 1.8 MB)
* PEP for NSF
<https://atlas-hllhc.docdb.bnl.gov/0006/000655/004/PEP%20US%20ATLAS%20HL-LHC%202019-01-16%20Unredacted%20for%20NSF%20Use.pdf>
(PEP US ATLAS HL-LHC 2019-01-16 Unredacted for NSF Use.pdf, 1.9 MB)
* Risk Register for ICE
<https://atlas-hllhc.docdb.bnl.gov/0006/000655/004/Risk-Register_v20%202019-01-15%20ADC%20TDC%20only%20for%20ICE%20Use.xlsx>
(Risk-Register_v20 2019-01-15 ADC TDC only for ICE Use.xlsx, 215.9 kB)
* Risk Register for NSF
<https://atlas-hllhc.docdb.bnl.gov/0006/000655/004/Risk-Register_v20%202019-01-15%20Full%20RR%20for%20NSF%20Use.xlsx>
(Risk-Register_v20 2019-01-15 Full RR for NSF Use.xlsx, 683.4 kB)
* WBS 6.4.1.1/2 BOE LAr ADC for ICE
<https://atlas-hllhc.docdb.bnl.gov/0006/000655/004/WBS%206-4-1-1%2B2%20BOE%20LAr%20ADC%202019-01-14%20Redacted%20for%20ICE%20Use.pdf>
(WBS 6-4-1-1+2 BOE LAr ADC 2019-01-14 Redacted for ICE ...pdf, 754.4 kB)
* WBS 6.4.1.1/2 BOE LAr ADC for NSF
<https://atlas-hllhc.docdb.bnl.gov/0006/000655/004/WBS%206-4-1-1%2B2%20BOE%20LAr%20ADC%202019-01-14%20Unredacted%20for%20NSF%20Use.pdf>
(WBS 6-4-1-1+2 BOE LAr ADC 2019-01-14 Unredacted for NS...pdf, 1.7 MB)
* WBS 6.4.1.1/2 Design Overview LAr ADC for ICE
<https://atlas-hllhc.docdb.bnl.gov/0006/000655/004/WBS%206-4-1-1%2B2%20Design%20Overview%20LAr%20ADC%202019-01-14%20Redacted%20for%20ICE%20Use.pdf>
(WBS 6-4-1-1+2 Design Overview LAr ADC 2019-01-14 Redac...pdf, 34.6 MB)
* WBS 6.4.1.1/2 Design Overview LAr ADC for NSF
<https://atlas-hllhc.docdb.bnl.gov/0006/000655/004/WBS%206-4-1-1%2B2%20Design%20Overview%20LAr%20ADC%202019-01-14%20Unredacted%20for%20NSF%20Use.pdf>
(WBS 6-4-1-1+2 Design Overview LAr ADC 2019-01-14 Unred...pdf, 53.8 MB)
* WBS 6.4.1.1/2 Technical Specifications LAr ADC
<https://atlas-hllhc.docdb.bnl.gov/0006/000655/004/WBS%206-4-1-1%2B2%20Technical%20Specifications%20LAr%20ADC%20v-0-1-1%202019-01-11.pdf>
(WBS 6-4-1-1+2 Technical Specifications LAr ADC v-0-1-1...pdf, 5.3 MB)
* WBS 6.6.3 BOE Muon TDC for ICE
<https://atlas-hllhc.docdb.bnl.gov/0006/000655/004/WBS%206-6-3%20BOE%20Muon%20TDC%202019-01-15%20Redacted%20for%20ICE%20Use.pdf>
(WBS 6-6-3 BOE Muon TDC 2019-01-15 Redacted for ICE Use.pdf, 700.1 kB)
* WBS 6.6.3 BOE Muon TDC for NSF
<https://atlas-hllhc.docdb.bnl.gov/0006/000655/004/WBS%206-6-3%20BOE%20Muon%20TDC%202019-01-15%20Unredacted%20for%20NSF%20Use.pdf>
(WBS 6-6-3 BOE Muon TDC 2019-01-15 Unredacted for NSF Use.pdf, 691.8 kB)
* WBS 6.6.3 Design Overview Muon TDC for ICE
<https://atlas-hllhc.docdb.bnl.gov/0006/000655/004/WBS%206-6-3%20Design%20Overview%20Muon%20TDC%202019-01-16%20Redacted%20for%20ICE%20Use.pdf>
(WBS 6-6-3 Design Overview Muon TDC 2019-01-16 Redacted...pdf, 4.0 MB)
* WBS 6.6.3 Design Overview Muon TDC for NSF
<https://atlas-hllhc.docdb.bnl.gov/0006/000655/004/WBS%206-6-3%20Design%20Overview%20Muon%20TDC%202019-01-16%20Unredacted%20for%20NSF%20Use.pdf>
(WBS 6-6-3 Design Overview Muon TDC 2019-01-16 Unredact...pdf, 4.1 MB)
* WBS 6.6.3 Technical Specifications Muon TDC
<https://atlas-hllhc.docdb.bnl.gov/0006/000655/004/WBS%206-6-3%20Technical%20Specifications%20Muon%20TDC%20V7%202019-01-21.pdf>
(WBS 6-6-3 Technical Specifications Muon TDC V7 2019-01...pdf, 233.5 kB)
* WBS Dictionary
<https://atlas-hllhc.docdb.bnl.gov/0006/000655/004/WBS%20Dictionary%20V14%202018-07-05.pdf>
(WBS Dictionary V14 2018-07-05.pdf, 299.1 kB)
Attachment:
ICE Documentation .xlsx
Description: application/vnd.openxmlformats-officedocument.spreadsheetml.sheet
Usatlas-hllhc-l2deputymgmt-nsf-l mailing list
Usatlas-hllhc-l2deputymgmt-nsf-l AT lists.bnl.gov
https://lists.bnl.gov/mailman/listinfo/usatlas-hllhc-l2deputymgmt-nsf-l
- [Usatlas-hllhc-lartl2l3-l] Fwd: [Usatlas-hllhc-l2deputymgmt-nsf-l] FW: Documentation required for NSF Independent Cost Estimate (ICE), John Parsons, 05/30/2019
Archive powered by MHonArc 2.6.24.