Skip to Content.
Sympa Menu

usatlas-hllhc-lartl2l3-l - Re: [Usatlas-hllhc-lartl2l3-l] Fwd: Fwd: [Usatlas-hllhc-l2deputymgmt-nsf-l] Scheduling risk scrubbings

usatlas-hllhc-lartl2l3-l AT lists.bnl.gov

Subject: U.S. ATLAS HL-LHC Upgrade LAr Level 2 and Level 3 Managers Mailing List

List archive

Chronological Thread  
  • From: John Parsons <parsons AT nevis.columbia.edu>
  • To: "usatlas-hllhc-lartl2l3-l AT lists.bnl.gov" <usatlas-hllhc-lartl2l3-l AT lists.bnl.gov>
  • Subject: Re: [Usatlas-hllhc-lartl2l3-l] Fwd: Fwd: [Usatlas-hllhc-l2deputymgmt-nsf-l] Scheduling risk scrubbings
  • Date: Thu, 6 Jun 2019 16:46:34 -0400


Hi all,

I attach 2 files related to the risk scrubbings.
One is some intro from Gustaaf, and other is a template
from Carl Haber of a slide to prepare for each risk
in order to explain and present it.

John

On 6/6/19 2:07 PM, John Parsons wrote:

Tim/Andy,

    We need to schedule the NSF risk scrubbing with the PO,
so I need you to get back to me today with your availability,
as requested below.

        John

-------- Forwarded Message --------
Subject: Fwd: [Usatlas-hllhc-l2deputymgmt-nsf-l] Scheduling risk scrubbings
Date: Tue, 4 Jun 2019 14:31:38 -0400
From: John Parsons <parsons AT nevis.columbia.edu>
To: usatlas-hllhc-lartl2l3-l AT lists.bnl.gov <usatlas-hllhc-lartl2l3-l AT lists.bnl.gov>




-------- Forwarded Message --------
Subject: [Usatlas-hllhc-l2deputymgmt-nsf-l] Scheduling risk scrubbings
Date: Tue, 4 Jun 2019 14:04:30 -0400
From: Gustaaf Brooijmans <gusbroo AT nevis.columbia.edu>
To: Usatlas-hllhc-l2deputymgmt-nsf-l AT lists.bnl.gov <Usatlas-hllhc-l2deputymgmt-nsf-l AT lists.bnl.gov>


Hello all,

Given that we'll need to run the simulation again after the risk scrubbing, we'd like to complete these sessions by June 21 at the latest.  We expect these to require ~half a day per system.  Tile is going first at 2:30 pm eastern this week:

https://indico.bnl.gov/event/6236/

John, Hong, Tom, Anyes, Elliot and Tae, could you identify a half day each between June 11 and 21 where we can hold these?  I will be in Europe starting on the 12th, so if it is possible to do it during the morning US time that would be great.

Thanks,

Gustaaf
_______________________________________________
Usatlas-hllhc-l2deputymgmt-nsf-l mailing list
Usatlas-hllhc-l2deputymgmt-nsf-l AT lists.bnl.gov
https://lists.bnl.gov/mailman/listinfo/usatlas-hllhc-l2deputymgmt-nsf-l

--
______________________________________________________________________

John Parsons
Nevis Labs, Email: parsons AT nevis.columbia.edu
Columbia University Phone: (914) 591-2820
P.O. Box 137 Fax: (914) 591-8120
Irvington, NY 10533 WWW:
https://urldefense.proofpoint.com/v2/url?u=http-3A__www.nevis.columbia.edu_-7Eparsons_&d=DwID-g&c=aTOVZmpUfPKZuaG9NO7J7Mh6imZbfhL47t9CpZ-pCOw&r=DSVO6Re8kg14S-cQbkBC2zfSx6Yt2GtkcD3fTWOeyfXXTwIA3TKWV-phDKykUKDr&m=Q1gK20_BInZkcJfVe-fQaw_PeMsojgMBJJKBl_aK2pc&s=mnZQ6cK9O-p4DPwUOw7A5m3Iv4EcjXeGsg4rqrGaKk0&e=


______________________________________________________________________

Attachment: 2019-06-06-risk-intro.pdf
Description: Adobe PDF document

Attachment: Risk Description Slide V1c.pptx
Description: application/vnd.openxmlformats-officedocument.presentationml.presentation




Archive powered by MHonArc 2.6.24.

Top of Page