  • From: John Parsons <parsons AT nevis.columbia.edu>
  • To: Tim Andeen <timothy.robert.andeen AT cern.ch>, "Ma, Hong" <hma AT bnl.gov>
  • Cc: "usatlas-hllhc-lartl2l3-l AT lists.bnl.gov" <usatlas-hllhc-lartl2l3-l AT lists.bnl.gov>
  • Subject: Re: [Usatlas-hllhc-lartl2l3-l] 6.4.1 slides
  • Date: Sat, 20 Jul 2019 09:47:00 -0400


Hi Tim/Andy,

I made the change to the schedule plot pointed out by
Tim. I was also asked during the L2 practice to add a line
showing MREFC start, which I have done. I attach an Excel
file with the updated version, as well as a jpg if you
prefer. Before sure to use the new one.

John

On 7/19/19 2:58 PM, Tim Andeen wrote:
Hi John

Thanks again for the comments.
Re your schedule, last production for the ADC 1/8/24, so through Q1 24.
For the pie charts I just used the estimation chart. Your dates for the reviews are correct.
Otherwise, I've made the changes and put the talk in docdb: https://atlas-hllhc.docdb.bnl.gov/cgi-bin/private/ShowDocument?docid=872

Best, Tim




On Thu, Jul 18, 2019 at 4:34 PM Tim Andeen <timothy.robert.andeen AT cern.ch <mailto:timothy.robert.andeen AT cern.ch>> wrote:

hi Hong, Good point. I forgot that what I do counts as useful
effort. :) -tim

On Thu, Jul 18, 2019 at 4:31 PM Ma, Hong <hma AT bnl.gov
<mailto:hma AT bnl.gov>> wrote:

__ __

                On slide 42, you have ____

Scientific Effort = 28% of Total____

Scientific effort consists of uncosted postdoc and graduate
student labor (for software development for test setups, test
data analysis, etc.) for both ADC and optics. Critical to
success of the project. ____

__ __

Does it not include your effort as a Prof? ____

__ __

                Hong. ____

__ __

*From: *Tim Andeen <timothy.robert.andeen AT cern.ch
<mailto:timothy.robert.andeen AT cern.ch>>
*Date: *Thursday, July 18, 2019 at 9:15 AM
*To: *John Parsons <parsons AT nevis.columbia.edu
<mailto:parsons AT nevis.columbia.edu>>, "Ma, Hong" <hma AT bnl.gov
<mailto:hma AT bnl.gov>>, "usatlas-hllhc-lartl2l3-l AT lists.bnl.gov
<mailto:usatlas-hllhc-lartl2l3-l AT lists.bnl.gov>"
<usatlas-hllhc-lartl2l3-l AT lists.bnl.gov
<mailto:usatlas-hllhc-lartl2l3-l AT lists.bnl.gov>>
*Subject: *6.4.1 slides____

__ __

Hi all, ____

__ __

I just added a ~complete draft of my slides

<https://indico.bnl.gov/event/6491/contributions/29868/subcontributions/1046/attachments/23807/34637/NSF-L3-6.4.1_v4.pptx>
to the agenda. As mentioned before, I need the labor and
material charts for the uncertainties (missing in cost books),
and in the backup I need to add the 1 risk/slide slides (updated
from risk scrubbing). John, I took several of the images from
your talk. A few questions below: ____

__ __

slide 25: remaining pre-MREFC work for optics. I just ignored
the new lpGBT delay. But doing that makes it look like we're
uninformed. And advice for this slide? ____

__ __

slide 27: the technical specs are all here. But I'm supposed to
have a backup slide of the US technical specifications. Isn't
this the same thing? ____

__ __

slide 44: I just took your schedule John. The dates look fine to
me, but is this an old schedule? ____

__ __

slide 48/49 Milestones: Was this the table I was supposed to use
here? Just double checking. ____

__ __

I need to proofread it, but it's decent and nearly complete now.
____

__ __

Best , Tim____

__ __

__ __

__ __

__ __

__ __

-- ____

---------------
Tim Andeen
Assistant Professor, Department of Physics
College of Natural Sciences
The University of Texas at Austin
Austin, TX 78712-1192
web: tandeen.web.cern.ch <http://tandeen.web.cern.ch>
office (TX): PMA 10.208
office (CERN): 304/1-024
ph (TX):  +1 512 475-9575
ph (CERN): +41 (0)22 76 758 14
email: tandeen AT utexas.edu <mailto:tandeen AT utexas.edu>
---------------____



-- ---------------
Tim Andeen
Assistant Professor, Department of Physics
College of Natural Sciences
The University of Texas at Austin
Austin, TX 78712-1192
web: tandeen.web.cern.ch <http://tandeen.web.cern.ch>
office (TX): PMA 10.208
office (CERN): 304/1-024
ph (TX):  +1 512 475-9575
ph (CERN): +41 (0)22 76 758 14
email: tandeen AT utexas.edu <mailto:tandeen AT utexas.edu>
---------------



--
---------------
Tim Andeen
Assistant Professor, Department of Physics
College of Natural Sciences
The University of Texas at Austin
Austin, TX 78712-1192
web: tandeen.web.cern.ch <http://tandeen.web.cern.ch>
office (TX): PMA 10.208
office (CERN): 304/1-024
ph (TX):  +1 512 475-9575
ph (CERN): +41 (0)22 76 758 14
email: tandeen AT utexas.edu <mailto:tandeen AT utexas.edu>
---------------

--
______________________________________________________________________

John Parsons
Nevis Labs, Email: parsons AT nevis.columbia.edu
Columbia University Phone: (914) 591-2820
P.O. Box 137 Fax: (914) 591-8120
Irvington, NY 10533 WWW:
https://urldefense.proofpoint.com/v2/url?u=http-3A__www.nevis.columbia.edu_-7Eparsons_&d=DwIDaQ&c=aTOVZmpUfPKZuaG9NO7J7Mh6imZbfhL47t9CpZ-pCOw&r=DSVO6Re8kg14S-cQbkBC2zfSx6Yt2GtkcD3fTWOeyfXXTwIA3TKWV-phDKykUKDr&m=JMjnLZQdTa3ISn4eqOosqS-64dayQm0MhksV0sL1xUQ&s=znf8NyDZQTwb0UtG8tDmK3htnEXJ3H87yPYSrbjnNwU&e=


______________________________________________________________________

Attachment: LAr-L3-Schedule-Template_FDR.jpg
Description: JPEG image

Attachment: LAr-L3-Schedule-Template_FDR.xlsx
Description: application/vnd.openxmlformats-officedocument.spreadsheetml.sheet