Skip to Content.
Sympa Menu

usatlas-hllhc-lartl2l3-l - Re: [Usatlas-hllhc-lartl2l3-l] 6.4.1 slides

usatlas-hllhc-lartl2l3-l AT lists.bnl.gov

Subject: U.S. ATLAS HL-LHC Upgrade LAr Level 2 and Level 3 Managers Mailing List

List archive

Chronological Thread  
  • From: John Parsons <parsons AT nevis.columbia.edu>
  • To: Tim Andeen <timothy.robert.andeen AT cern.ch>, "Ma, Hong" <hma AT bnl.gov>
  • Cc: "usatlas-hllhc-lartl2l3-l AT lists.bnl.gov" <usatlas-hllhc-lartl2l3-l AT lists.bnl.gov>
  • Subject: Re: [Usatlas-hllhc-lartl2l3-l] 6.4.1 slides
  • Date: Sat, 20 Jul 2019 09:49:40 -0400


Sorry, use this jpg instead since last one cut off
the MREFC text.

On 7/20/19 9:47 AM, John Parsons wrote:

Hi Tim/Andy,

    I made the change to the schedule plot pointed out by
Tim.  I was also asked during the L2 practice to add a line
showing MREFC start, which I have done.  I attach an Excel
file with the updated version, as well as a jpg if you
prefer.  Before sure to use the new one.

        John

On 7/19/19 2:58 PM, Tim Andeen wrote:
Hi John

Thanks again for the comments.
Re your schedule, last production for the ADC 1/8/24, so through Q1 24.
For the pie charts I just used the estimation chart. Your dates for the reviews are correct.
Otherwise, I've made the changes and put the talk in docdb: https://atlas-hllhc.docdb.bnl.gov/cgi-bin/private/ShowDocument?docid=872

Best, Tim




On Thu, Jul 18, 2019 at 4:34 PM Tim Andeen <timothy.robert.andeen AT cern.ch <mailto:timothy.robert.andeen AT cern.ch>> wrote:

    hi Hong, Good point. I forgot that what I do counts as useful
    effort. :) -tim

    On Thu, Jul 18, 2019 at 4:31 PM Ma, Hong <hma AT bnl.gov
    <mailto:hma AT bnl.gov>> wrote:

        __ __

                         On slide 42, you have ____

        Scientific Effort = 28% of Total____

        Scientific effort consists of uncosted postdoc and graduate
        student labor (for software development for test setups, test
        data analysis, etc.) for both ADC and optics. Critical to
        success of the project. ____

        __ __

        Does it not include your effort as a Prof? ____

        __ __

                         Hong. ____

        __ __

        *From: *Tim Andeen <timothy.robert.andeen AT cern.ch
        <mailto:timothy.robert.andeen AT cern.ch>>
        *Date: *Thursday, July 18, 2019 at 9:15 AM
        *To: *John Parsons <parsons AT nevis.columbia.edu
        <mailto:parsons AT nevis.columbia.edu>>, "Ma, Hong" <hma AT bnl.gov
        <mailto:hma AT bnl.gov>>, "usatlas-hllhc-lartl2l3-l AT lists.bnl.gov
        <mailto:usatlas-hllhc-lartl2l3-l AT lists.bnl.gov>"
        <usatlas-hllhc-lartl2l3-l AT lists.bnl.gov
        <mailto:usatlas-hllhc-lartl2l3-l AT lists.bnl.gov>>
        *Subject: *6.4.1 slides____

        __ __

        Hi all, ____

        __ __

        I just added a ~complete draft of my slides
<https://indico.bnl.gov/event/6491/contributions/29868/subcontributions/1046/attachments/23807/34637/NSF-L3-6.4.1_v4.pptx>
        to the agenda. As mentioned before, I need the labor and
        material charts for the uncertainties (missing in cost books),
        and in the backup I need to add the 1 risk/slide slides (updated
        from risk scrubbing). John, I took several of the images from
        your talk. A few questions below: ____

        __ __

        slide 25: remaining pre-MREFC work for optics. I just ignored
        the new lpGBT delay. But doing that makes it look like we're
        uninformed. And advice for this slide? ____

        __ __

        slide 27: the technical specs are all here. But I'm supposed to
        have a backup slide of the US technical specifications. Isn't
        this the same thing? ____

        __ __

        slide 44: I just took your schedule John. The dates look fine to
        me, but is this an old schedule? ____

        __ __

        slide 48/49 Milestones: Was this the table I was supposed to use
        here? Just double checking. ____

        __ __

        I need to proofread it, but it's decent and nearly complete now.
        ____

        __ __

        Best , Tim____

        __ __

        __ __

        __ __

        __ __

        __ __

        -- ____

        ---------------
        Tim Andeen
        Assistant Professor, Department of Physics
        College of Natural Sciences
        The University of Texas at Austin
        Austin, TX 78712-1192
        web: tandeen.web.cern.ch <http://tandeen.web.cern.ch>
        office (TX): PMA 10.208
        office (CERN): 304/1-024
        ph (TX):  +1 512 475-9575
        ph (CERN): +41 (0)22 76 758 14
        email: tandeen AT utexas.edu <mailto:tandeen AT utexas.edu>
        ---------------____



    --     ---------------
    Tim Andeen
    Assistant Professor, Department of Physics
    College of Natural Sciences
    The University of Texas at Austin
    Austin, TX 78712-1192
    web: tandeen.web.cern.ch <http://tandeen.web.cern.ch>
    office (TX): PMA 10.208
    office (CERN): 304/1-024
    ph (TX):  +1 512 475-9575
    ph (CERN): +41 (0)22 76 758 14
    email: tandeen AT utexas.edu <mailto:tandeen AT utexas.edu>
    ---------------



--
---------------
Tim Andeen
Assistant Professor, Department of Physics
College of Natural Sciences
The University of Texas at Austin
Austin, TX 78712-1192
web: tandeen.web.cern.ch <http://tandeen.web.cern.ch>
office (TX): PMA 10.208
office (CERN): 304/1-024
ph (TX):  +1 512 475-9575
ph (CERN): +41 (0)22 76 758 14
email: tandeen AT utexas.edu <mailto:tandeen AT utexas.edu>
---------------


_______________________________________________
Usatlas-hllhc-lartl2l3-l mailing list
Usatlas-hllhc-lartl2l3-l AT lists.bnl.gov
https://lists.bnl.gov/mailman/listinfo/usatlas-hllhc-lartl2l3-l


--
______________________________________________________________________

John Parsons
Nevis Labs, Email: parsons AT nevis.columbia.edu
Columbia University Phone: (914) 591-2820
P.O. Box 137 Fax: (914) 591-8120
Irvington, NY 10533 WWW:
https://urldefense.proofpoint.com/v2/url?u=http-3A__www.nevis.columbia.edu_-7Eparsons_&d=DwIDaQ&c=aTOVZmpUfPKZuaG9NO7J7Mh6imZbfhL47t9CpZ-pCOw&r=DSVO6Re8kg14S-cQbkBC2zfSx6Yt2GtkcD3fTWOeyfXXTwIA3TKWV-phDKykUKDr&m=npoVIvRV_wGDkepCcLyTaAIcmQfFNu-j422s9ZfDFEI&s=2hjkhboU32JC24WSLIIdRkIBDli7wC5UlpYq3VKBKe8&e=


______________________________________________________________________

Attachment: LAr-L3-Schedule-Template_FDR.jpg
Description: JPEG image




Archive powered by MHonArc 2.6.24.

Top of Page