usatlas-hllhc-lartl2l3-l - [Usatlas-hllhc-lartl2l3-l] Fwd: [Usatlas-hllhc-l2l3ics-l] December 2020 CPR Report

usatlas-hllhc-lartl2l3-l AT lists.bnl.gov

Subject: U.S. ATLAS HL-LHC Upgrade LAr Level 2 and Level 3 Managers Mailing List

List archive

Chronological Thread  
  • From: John Parsons <parsons AT nevis.columbia.edu>
  • To: "usatlas-hllhc-lartl2l3-l AT lists.bnl.gov" <usatlas-hllhc-lartl2l3-l AT lists.bnl.gov>
  • Subject: [Usatlas-hllhc-lartl2l3-l] Fwd: [Usatlas-hllhc-l2l3ics-l] December 2020 CPR Report
  • Date: Wed, 13 Jan 2021 16:31:03 -0500




-------- Forwarded Message --------
Subject: [Usatlas-hllhc-l2l3ics-l] December 2020 CPR Report
Date: Wed, 13 Jan 2021 19:51:17 +0000
From: Freedman, Rhoumela <rfreedman AT bnl.gov>
To: usatlas-hllhc-l2l3ics-l AT lists.bnl.gov <usatlas-hllhc-l2l3ics-l AT lists.bnl.gov>



Hello!

The December 2020 CPR report has been posted up into DocDB 1042.

The December CPR, detailed schedule reports, and SPI/CPI plots are available in IPD (https://ipdv2.bnl.gov/select_project.aspx <https://urldefense.com/v3/__https:/nam05.safelinks.protection.outlook.com/?url=https*3A*2F*2Fipdv2.bnl.gov*2Fselect_project.aspx&data=02*7C01*7Cjeffery.ashenfelter*40yale.edu*7C4f2866d2a85b402cc7df08d8139af0e8*7Cdd8cbebb21394df8b4114e3e87abeb5c*7C0*7C0*7C637280903481857695&sdata=USjxqWBt4u2uB*2B9xKtzDr40IPEweR3Oj*2BvLRq65XeaE*3D&reserved=0__;JSUlJSUlJSUlJSUlJSUl!!P4SdNyxKAPE!UzSuisfs2USavG1mU95qXeVtD3GnCBZqBtzsa8wNN6BX8qTcNwOqLSfqa9XM48Uo$>). Please review the variances and *provide the Variance Analysis by Friday, January 22.*

**

**** ADDITIONAL INSTRUCTIONS: ****

*_DOE SCOPE ONLY_**– Starting with the December 2020 CPR Report, Variance Analysis should be reported at Level 2 and Level 3 in preparation for baselining the DOE Scope. *

*_FOR ALL SCOPES_**- Please make sure to have your Variance Analysis explain the Cumulative reason for the variance.***__

*** *_PLEASE NOTE:_* If you are having problems getting on the BNL VPN or accessing the IPD website, please let me know so I can expedite a request to BNL ITD to assist with your access. ***

Please let me know if you have any questions.

Thank you,

Rhoumela

Rhoumela Freedman, Administrator

U.S. ATLAS HL-LHC Upgrade Project

Brookhaven National Laboratory, Physics Dept.

Tel: (631) 344-3460

Fax: (631) 344-6179

rfreedman AT bnl.gov <mailto:rfreedman AT bnl.gov>

_______________________________________________
Usatlas-hllhc-l2l3ics-l mailing list
Usatlas-hllhc-l2l3ics-l AT lists.bnl.gov
https://lists.bnl.gov/mailman/listinfo/usatlas-hllhc-l2l3ics-l


  • [Usatlas-hllhc-lartl2l3-l] Fwd: [Usatlas-hllhc-l2l3ics-l] December 2020 CPR Report, John Parsons, 01/13/2021

Archive powered by MHonArc 2.6.24.

Top of Page