Re: [Usatlas-hllhc-lartl2l3-l] comments of slides for NSF DR
- From: Tim Andeen <tandeen AT utexas.edu>
- To: John Parsons <parsons AT nevis.columbia.edu>
- Cc: "usatlas-hllhc-lartl2l3-l AT lists.bnl.gov" <usatlas-hllhc-lartl2l3-l AT lists.bnl.gov>
- Subject: Re: [Usatlas-hllhc-lartl2l3-l] comments of slides for NSF DR
- Date: Sat, 25 Feb 2023 17:25:47 -0600
Hi John,
Thanks, I took your suggestions and made the changes (and fixed a few more typos). It’s in docdb, I guess we email Rhoumela to fix the links? I also took a quick look at your slides.
On your L2 slides:
p13 - **/21 in second to last bullet looks like a place holder?
On your L3 slides:
p14 - could add when LSB2s arrive at Columbia, when FEB2s are delivered to CERN
p16 - could add names of Columbia/Pitt ESH people (my sides have Kathleen Crowley, https://research.columbia.edu/content/environmental-health-safety for Columbia)
-Tim
On Feb 25, 2023 at 1:02:25 PM, John Parsons <parsons AT nevis.columbia.edu> wrote:
Hi all,
I looked over the various talks for the DR, and they are all in good
shape. I give some comments/suggestions below.
John
Tim
-----
pp. 6-7 - these numbers have not changed, so you should just flash them
to have time to focus on changes
p. 8 - COLUTA does not meet the "<100 mW per channel" spec, which at FDR
was agreed to be changed (but I don't know if we formally changed it).
For now, just delete this spec. from the slide
- since you mention the downlink speed, maybe add the 10.24 Gbps
uplink speed?
p. 9 - some variation in font size in table; is this intentional?
p. 16 - BER limit should be 10^-17 (not 10^17)
p. 17 (or somewhere) - add that first preprod. wafers just arrived at CERN?
p. 20 - you mention "testing 80 prototypes from MPW run", but we have
only tested ~20 so far (in QFN). Maybe change this to the plan to test
150 or so in BGA from extra dice ordered?
p. 23 - add that can soon retire risk of additional ADC iteration, once
BGA is validated
p. 24 - "... and the LAr Phase 1 upgrade." (ie. not Trigger
Andy
-----
p. 7 - why do you have "ATLAS FDR and PRR ?" (you do not need that)
p. 9 - change to "Will submit PCB for sRTM v2 in March 2023"
- also include previous and new numbers of boards
p. 15... - still need to be completed
Hong
-----
p. 1 - some formatting issues on our names...
p. 3 - in my version of this slide for other reviews, I highlight the
last bullet of each in a different color to stress both DOE L4s are
"critical"
p. 4 - put a box around the DOE scope?
--
______________________________________________________________________
John Parsons
Nevis Labs, Email: parsons AT nevis.columbia.edu
Columbia University Phone: (914) 591-2820
P.O. Box 137 Fax: (914) 591-8120
Irvington, NY 10533 WWW: https://urldefense.com/v3/__http://www.nevis.columbia.edu/*parsons/__;fg!!P4SdNyxKAPE!AoBrarMs4OZjzRmOr35xuZHbFRYdBhCowhdLxobOCPUTEacvSFrNdBynLLSRnjp6v7G8lO5IOCXS_3tzBnZ_LWTs6Gk-WXlosmIOVWdq17nvjg$
______________________________________________________________________
_______________________________________________
Usatlas-hllhc-lartl2l3-l mailing list
Usatlas-hllhc-lartl2l3-l AT lists.bnl.gov
https://lists.bnl.gov/mailman/listinfo/usatlas-hllhc-lartl2l3-l
-
[Usatlas-hllhc-lartl2l3-l] comments of slides for NSF DR,
John Parsons, 02/25/2023
-
Re: [Usatlas-hllhc-lartl2l3-l] comments of slides for NSF DR,
Tim Andeen, 02/25/2023
-
Re: [Usatlas-hllhc-lartl2l3-l] comments of slides for NSF DR,
Tim Andeen, 02/25/2023
- Re: [Usatlas-hllhc-lartl2l3-l] comments of slides for NSF DR, John Parsons, 02/26/2023
-
Re: [Usatlas-hllhc-lartl2l3-l] comments of slides for NSF DR,
John Parsons, 02/26/2023
- Re: [Usatlas-hllhc-lartl2l3-l] comments of slides for NSF DR, Ma, Hong, 02/26/2023
-
Re: [Usatlas-hllhc-lartl2l3-l] comments of slides for NSF DR,
Tim Andeen, 02/25/2023
-
Re: [Usatlas-hllhc-lartl2l3-l] comments of slides for NSF DR,
Tim Andeen, 02/25/2023
Archive powered by MHonArc 2.6.24.