- From: John Parsons <parsons AT nevis.columbia.edu>
- To: "usatlas-hllhc-lartl2l3-l AT lists.bnl.gov" <usatlas-hllhc-lartl2l3-l AT lists.bnl.gov>
- Subject: [Usatlas-hllhc-lartl2l3-l] QC slides for review
- Date: Sun, 16 Apr 2023 13:16:33 -0400
Hi Tim and Andy,
As was discussed at the meeting with them last Friday, the NSF review committee seems quite interested in discussing QC planning. Here are some of the relevant comments:
- "the panel expressed interest in knowing about QA/QC – especially impacts on vendors, and also about ATLAS’s plans for acceptance test of items delivered to CERN."
- "We would like to request an adjustment to the review schedule next week to enable Paul O’Connor, Rich Abbot, and George Angeli to look at electronics production QA/QC, testing, and verification testing upon delivery at CERN for each of the technical areas."
- "The panel has concern about QA/QC risks associated with the current supply chain environment.
Please comment on how these concerns are incorporated into ATLAS plans. Please plan to discuss COVID and consequent supply chain and labor shortage impacts on vendor QA/QC. How is ATLAS validating QA/QC at the vendors? (Please include this in the first day’s plenary presentations.) Please justify to the panel that sufficient labor has been budgeted to carry out QC and verification tests."
I propose that each L3 prepare a few dedicated QC slides, along the lines of what we already did for Cost&Schedule. Then, if and when during the review the "QC reviewers" appear in our breakout, we could bring up those slides to guide the discussion.
I have prepared such slides for the FEB2, and placed them at the end of the "regular talk" and before the "Cost&Schedule" slides. You can see my draft version in slides 20-25 of the new version of my talk on docdb (https://atlas-hllhc.docdb.bnl.gov/cgi-bin/public/ShowDocument?docid=1574).
I suggest Tim and Andy also prepare such slides. Some particular
comments:
Tim - ADC is well advanced, so will be looked to for an example of well-advanced QC plans. I suggest you show a summary table of parameters measured in prep. for FDR, and say a subset (still being finalized) will be measured in the robotic test setup and stored in the dB. Also, have an idea of how many minutes per ASIC it will take to perform the test, and make sure the time (and manpower) you have allocated in the RLS is adequate to get it all done as scheduled
Andy - are SRTM tests going to be done at Assembler, or just at SBU? (For FEB2, we will do some tests at Assembler, like we did last time, but that might well not be worth the effort for the smaller number of SRTM boards??) Give some idea of what sort of tests are needed to QC-qualify a board (list does not need to be final, but should be indicative). How much time per SRTM will it take to do the QC test, and make sure the time (and manpower) you have allocated in the RLS is adequate to get it all done as scheduled.
Some other questions:
- any tests needed with the LASP, or SBU can just use the SRTM plus its own Testerboard?
- any plans to do some of QC-related tests elsewhere (eg. NYU)?
- what "acceptance test" is needed at CERN? (for FEB2 it is basically just visual inspection plus leak test)
These slides would be needed for Tues. morning. Make a start of them as soon as you can, and send around a draft when you have something ready.
Regards,
John
--
______________________________________________________________________
John Parsons
Nevis Labs, Email: parsons AT nevis.columbia.edu
Columbia University Phone: (914) 591-2820
P.O. Box 137 Fax: (914) 591-8120
Irvington, NY 10533 WWW:
https://urldefense.com/v3/__http://www.nevis.columbia.edu/*parsons/__;fg!!P4SdNyxKAPE!CMRbo49w5aBUDiUzdbo9QJj0HZ-ECtjcaWNVXYtyRU1gmmLg8d01_2L7XUINhfQq0nzKcSJ7r2KPo5S6GVT0PDJ0DdUIAiJLiGvyFClPbJ08KA$
______________________________________________________________________
-
[Usatlas-hllhc-lartl2l3-l] QC slides for review,
John Parsons, 04/16/2023
-
Re: [Usatlas-hllhc-lartl2l3-l] QC slides for review,
Andy Haas, 04/17/2023
- Re: [Usatlas-hllhc-lartl2l3-l] QC slides for review, Tim Andeen, 04/17/2023
- Re: [Usatlas-hllhc-lartl2l3-l] QC slides for review, John Parsons, 04/17/2023
-
Re: [Usatlas-hllhc-lartl2l3-l] QC slides for review,
Andy Haas, 04/17/2023
Archive powered by MHonArc 2.6.24.