usatlas-hllhc-lartl2l3-l AT lists.bnl.gov
Subject: U.S. ATLAS HL-LHC Upgrade LAr Level 2 and Level 3 Managers Mailing List
List archive
Re: [[Usatlas-hllhc-lartl2l3-l] ] draft slides posted for LAr L2 talk at NSF review
- From: "Ma, Hong" <hma AT bnl.gov>
- To: "Parsons, John" <parsons AT nevis.columbia.edu>
- Cc: "usatlas-hllhc-lartl2l3-l AT lists.bnl.gov" <usatlas-hllhc-lartl2l3-l AT lists.bnl.gov>
- Subject: Re: [[Usatlas-hllhc-lartl2l3-l] ] draft slides posted for LAr L2 talk at NSF review
- Date: Wed, 25 Jun 2025 14:09:56 +0000
Hi John,
I noticed that on the critical path chart, slide 41 in the backup, ADC production tasks in UTAU are on the critical path. So be careful with the statement on slide 23 “Critical Path runs through FEB2 production and QC testing”. It needs to be qualified that the ADC schedule in P6 is incorrect.
I think this is because your last 25% FEB2 assembly requires the 100% completion at UTAU (task FEB21600 through FEB21545R and FEE20940). Since we know the UTAU testing schedule in the working schedule is too pessimistic, I believe you can gain 2 months if the ADC production QC is completed in FY26 as expected. But there is not much you can do to P6 now.
Best,
Hong.
From:
usatlas-hllhc-lartl2l3-l-request AT lists.bnl.gov <usatlas-hllhc-lartl2l3-l-request AT lists.bnl.gov> on behalf of Andy Haas <andy.haas AT nyu.edu> Right about the optical/electrical paths. We used the stratix dev kit at nyu, with a standard 100Gb QSFP adapter.
On Tue, Jun 24, 2025, 2:09 PM John Parsons <parsons AT nevis.columbia.edu> wrote:
|
-
Re: [[Usatlas-hllhc-lartl2l3-l] ] draft slides posted for LAr L2 talk at NSF review
, (continued)
-
Re: [[Usatlas-hllhc-lartl2l3-l] ] draft slides posted for LAr L2 talk at NSF review,
John Parsons, 06/22/2025
- Re: [[Usatlas-hllhc-lartl2l3-l] ] draft slides posted for LAr L2 talk at NSF review, Ma, Hong, 06/22/2025
-
Re: [[Usatlas-hllhc-lartl2l3-l] ] draft slides posted for LAr L2 talk at NSF review,
John Parsons, 06/22/2025
-
Re: [[Usatlas-hllhc-lartl2l3-l] ] draft slides posted for LAr L2 talk at NSF review,
Ma, Hong, 06/22/2025
- Re: [[Usatlas-hllhc-lartl2l3-l] ] draft slides posted for LAr L2 talk at NSF review, John Parsons, 06/22/2025
- Re: [[Usatlas-hllhc-lartl2l3-l] ] draft slides posted for LAr L2 talk at NSF review, John Parsons, 06/22/2025
- Re: [[Usatlas-hllhc-lartl2l3-l] ] draft slides posted for LAr L2 talk at NSF review, Tim Andeen, 06/22/2025
-
Re: [[Usatlas-hllhc-lartl2l3-l] ] draft slides posted for LAr L2 talk at NSF review,
Ma, Hong, 06/22/2025
-
Re: [[Usatlas-hllhc-lartl2l3-l] ] draft slides posted for LAr L2 talk at NSF review,
Andy Haas, 06/23/2025
-
Re: [[Usatlas-hllhc-lartl2l3-l] ] draft slides posted for LAr L2 talk at NSF review,
John Parsons, 06/24/2025
-
Re: [[Usatlas-hllhc-lartl2l3-l] ] draft slides posted for LAr L2 talk at NSF review,
Andy Haas, 06/24/2025
-
Re: [[Usatlas-hllhc-lartl2l3-l] ] draft slides posted for LAr L2 talk at NSF review,
Ma, Hong, 06/25/2025
- Re: [[Usatlas-hllhc-lartl2l3-l] ] draft slides posted for LAr L2 talk at NSF review, John Parsons, 06/25/2025
-
Re: [[Usatlas-hllhc-lartl2l3-l] ] draft slides posted for LAr L2 talk at NSF review,
Ma, Hong, 06/25/2025
-
Re: [[Usatlas-hllhc-lartl2l3-l] ] draft slides posted for LAr L2 talk at NSF review,
Andy Haas, 06/24/2025
-
Re: [[Usatlas-hllhc-lartl2l3-l] ] draft slides posted for LAr L2 talk at NSF review,
John Parsons, 06/24/2025
-
Re: [[Usatlas-hllhc-lartl2l3-l] ] draft slides posted for LAr L2 talk at NSF review,
John Parsons, 06/22/2025
Archive powered by MHonArc 2.6.24.