Skip to Content.
Sympa Menu

usatlas-hllhc-lartl2l3-l - Re: [[Usatlas-hllhc-lartl2l3-l] ] Fwd: Reminder that Lar L2 annual report is due tomorrow

usatlas-hllhc-lartl2l3-l AT lists.bnl.gov

Subject: U.S. ATLAS HL-LHC Upgrade LAr Level 2 and Level 3 Managers Mailing List

List archive

Chronological Thread  
  • From: John Parsons <parsons AT nevis.columbia.edu>
  • To: Tim Andeen <timothy.robert.andeen AT cern.ch>, "usatlas-hllhc-lartl2l3-l AT lists.bnl.gov" <usatlas-hllhc-lartl2l3-l AT lists.bnl.gov>
  • Subject: Re: [[Usatlas-hllhc-lartl2l3-l] ] Fwd: Reminder that Lar L2 annual report is due tomorrow
  • Date: Fri, 10 Oct 2025 18:55:59 -0400

!-------------------------------------------------------------------|
This Message Is From an External Sender
This message came from outside your organization.
|-------------------------------------------------------------------!


Hi Tim,

Thanks for this. I give a few suggestions below.

John

- the plot should extend out until the end of the delivery
- concerning the "expected", I think you should show 35/week, which is what is in the CC quote (which they are so far out-performing)
- I would suggest to add some other curves, to include VTRx+ delivered from CERN to CC, reconnectorized fiber assemblies delivered from CC to SMU, fiber assemblies tested at SMU, and (eventually) fiber assemblies delivered from SMU to Columbia

- I give in the attachment as an example what I did for the original FEB


On 10/10/25 6:00 PM, Tim Andeen (via usatlas-hllhc-lartl2l3-l Mailing List) wrote:
Hi John, Here’s a link to the draft chart: https: //docs. google. com/ spreadsheets/d/e/2PACX-1vQdKvDPjm6DKWZJ0R6Sn- t7WvqHc3Je__zsZW2DXYuhmsU_veSuid-bequPSASGkrSOeFKCMjLNO5fj/pubchart? oid=182533860&format=image And again to the spreadsheet: 
ZjQcmQRYFpfptBannerStart
This Message Is From an External Sender
This message came from outside your organization.
ZjQcmQRYFpfptBannerEnd

Hi John,

Here’s a link to the draft chart: https://urldefense.com/v3/__https://docs.google.com/spreadsheets/__;!!P4SdNyxKAPE!EEEtKWQJdJmReQ9qcfC2RT3Qq96f7RNJMezHY8AhzUIxN-p6y6fcCVeZKUzK7rG0oHHC3tAC5Hg_3DefCXcrTvKZ2WETe488LSYmJg9tS0kXmw$ d/e/2PACX-1vQdKvDPjm6DKWZJ0R6Sn-t7WvqHc3Je__zsZW2DXYuhmsU_veSuid- bequPSASGkrSOeFKCMjLNO5fj/pubchart?oid=182533860&format=image <https:// urldefense.com/v3/__https://urldefense.com/v3/__https://docs.google.com/spreadsheets/d/__;!!P4SdNyxKAPE!EEEtKWQJdJmReQ9qcfC2RT3Qq96f7RNJMezHY8AhzUIxN-p6y6fcCVeZKUzK7rG0oHHC3tAC5Hg_3DefCXcrTvKZ2WETe488LSYmJg9EAeSlnw$ e/2PACX-1vQdKvDPjm6DKWZJ0R6Sn-t7WvqHc3Je__zsZW2DXYuhmsU_veSuid- bequPSASGkrSOeFKCMjLNO5fj/pubchart?oid=182533860&format=image__;!! P4SdNyxKAPE!Hir7lXNZYV7HcN6yU-7RMnPQX7i028RWEdFKatH-1QEsKtiWQ87hnlO- fE2ESOV1LEk1DQih093wYRvYEl1SZyYCLfDcjNB--0L11mOU1a9a1wSU$>

And again to the spreadsheet: https://urldefense.com/v3/__https://docs.google.com/spreadsheets/__;!!P4SdNyxKAPE!EEEtKWQJdJmReQ9qcfC2RT3Qq96f7RNJMezHY8AhzUIxN-p6y6fcCVeZKUzK7rG0oHHC3tAC5Hg_3DefCXcrTvKZ2WETe488LSYmJg9tS0kXmw$ d/12D-JScYCZTUhr_7bzx3g2GjSRqYlIeuDv--kg6x9JxY/edit?usp=sharing <https://urldefense.com/v3/__https://docs.google.com/spreadsheets/d/12D- JScYCZTUhr_7bzx3g2GjSRqYlIeuDv--kg6x9JxY/edit?usp=sharing__;!! P4SdNyxKAPE!Hir7lXNZYV7HcN6yU-7RMnPQX7i028RWEdFKatH-1QEsKtiWQ87hnlO- fE2ESOV1LEk1DQih093wYRvYEl1SZyYCLfDcjNB--0L11mOU1YcLWTUM$> (the new charts are under “Plots”).

Let me know what you think, suggestions welcome. I’ll use something similar for the ADC. It’s easy to update for the report.

Best, Tim

*From: *usatlas-hllhc-lartl2l3-l-request AT lists.bnl.gov <usatlas-hllhc- lartl2l3-l-request AT lists.bnl.gov> on behalf of John Parsons <parsons AT nevis.columbia.edu>
*Date: *Thursday, October 9, 2025 at 3:43 PM
*To: *usatlas-hllhc-lartl2l3-l AT lists.bnl.gov <usatlas-hllhc-lartl2l3- l AT lists.bnl.gov>
*Subject: *[[Usatlas-hllhc-lartl2l3-l] ] Fwd: Reminder that Lar L2 annual report is due tomorrow

!-------------------------------------------------------------------|
  This Message Is From an External Sender
  This message came from outside your organization.
|-------------------------------------------------------------------!


A reminder the NSF annual Report is due to Mike tomorrow.  I will read
thorough what I received so far and then send it to him.  @Tim, you were
going to add a fiber "production tracking plot"??  When can I have a
first version?  (we can update it in a few weeks)

        John


-------- Forwarded Message --------
Subject:         Reminder that Lar L2 annual report is due tomorrow
Date:    Thu, 9 Oct 2025 16:01:04 +0000
From:    Michael Tuts <tuts AT pmtuts.net>
To:      John A Parsons (parsons AT nevis.columbia.edu)
<parsons AT nevis.columbia.edu>



Hi John,

Just a reminder that the L2 LAr annual report is due tomorrow – and if
you need to add/change a figure before I send to NSF is fine.

Thanks, Mike


--
______________________________________________________________________

John Parsons
Nevis Labs, Email: parsons AT nevis.columbia.edu
Columbia University Phone: (914) 591-2820
P.O. Box 137 Fax: (914) 591-8120
Irvington, NY 10533 WWW:
https://urldefense.com/v3/__http://www.nevis.columbia.edu/*parsons/__;fg!!P4SdNyxKAPE!EEEtKWQJdJmReQ9qcfC2RT3Qq96f7RNJMezHY8AhzUIxN-p6y6fcCVeZKUzK7rG0oHHC3tAC5Hg_3DefCXcrTvKZ2WETe488LSYmJg-IhZchNQ$


______________________________________________________________________

Attachment: Screenshot 2025-10-10 at 6.53.29 PM.png
Description: PNG image




Archive powered by MHonArc 2.6.24.

Top of Page