Latest version of IR dry-run tomorrow

Ps I do not know what I was thinking in my last version. The use of some mix
of HL and HA parameters indeed seems the right thing to do.

The current very large y divergences in both HA and HL are probably the most
worrying things to discuss. We need more study of the Low Divergence (LD),
and very Low Divergence (VLD) cases that I had started looking at. I am not
sure how much that should be discussed in the Review. I am also not sure how
much mention I should make of the VHL (without cooling) case.

Bob

Ps I know this will have to be put into Power Point, unless we could persuade
Scott to make a Tex version that mimics PP. Do we have the PP profile that we
should be using?