I can make it Friday and agree it makes sense to go through some of these details.  It has been a whils. Can we also look at what you have for vacuum components in your estimate even though it is too late to change? My estimate for the storage ring does not include any $ for the IR section as previously discussed. We can do this after the general meeting.

Get Outlook for Android


From: E-rhic-ir-l <e-rhic-ir-l-bounces AT lists.bnl.gov> on behalf of Aschenauer Elke-Caroline <elke AT bnl.gov>
Sent: Tuesday, December 18, 2018 8:16:15 PM
To: Christie, William
Cc: e-rhic-ir-l AT lists.bnl.gov
Subject: Re: [E-rhic-ir-l] IR meeting this week?
 
I’m pretty indifferent with respect having a meeting or not. 
But I would like to make a general point.
we made quite some changes to the IR layout. I think before we continue making changes, 
I think we need to do the same checks to this design as we did to the pre-CD one. 
For this it needs that the current design is really matched to the rest of the hadron and lepton machine and I need the madex files from Stephen and Guillaume.

I also think we need to give time to Charles and Alexei to check the vacuum setup and the impedance.

I think it is really important to do this steps before we do more changes  to the design.

Cheers elke

On Dec 18, 2018, at 14:09, Christie, William <christie AT bnl.gov> wrote:

Hi Holger (and Brett),
    Thank you for this question.
    Personally I don't have a strong preference for whether we hold an
IR Design meeting this Friday or delay it until January 4th, but if
anyone feels strongly that they'd like to present something this Friday
I'd like to give them a chance to speak up.
    So, if anyone feels strongly that we should meet this Friday please
let me know before the end of the day tomorrow (Wednesday Dec. 19th). If
no one requests that we meet this week, I'll schedule the next IR Design
meeting for Friday, January 4th, at 2:30 pm.
    Greetings,
        Bill
On 12/17/18 15:46, Witte, Holger wrote:
Hi Bill,

I am sitting here with Brett and we were wondering if there is an IR meeting this week?

Best wishes,

Holger


_______________________________________________
E-rhic-ir-l mailing list
E-rhic-ir-l AT lists.bnl.gov
https://lists.bnl.gov/mailman/listinfo/e-rhic-ir-l

 ( `,_' )+=-+=-+=-+=-+=-+=-+=-+=-+=-+=-+=-+=-+=-+=-+=-+=-+=-+=
  )    `\                                                     -
 /    '. |                                                     +
 |       `,              Elke-Caroline Aschenauer               =
  \,_  `-/                                                       -
  ,&&&&&V         Brookhaven National Lab                         +
 ,&&&&&&&&:       Physics Dept.,            25 Corona Road         =
,&&&&&&&&&&;      Bldg. 510 /2-195          Rocky Point, NY,        -
|  |&&&&&&&;\     20 Pennsylvania Avenue                 11778       +
|  |       :_) _  Upton, NY 11973                                     =
|  |       ;--' | Tel.:  001-631-344-4769   Tel.:  001-631-569-4290    -
'--'   `-.--.   |                           Cell:  001-757-256-5224     +
   \_    |  |---'                                                        =
     `-._\__/     Mail: elke AT bnl.gov        elke.caroline AT me.com          -
            =-+=-+=-+=-+=-+=-+=-+=-+=-+=-+=-+=-+=-+=-+=-+=-+=-+=-+=-+=-+=-+=






Archive powered by MHonArc 2.6.24.

Top of Page