eic-projdet-pfrich-l AT lists.bnl.gov
Subject: ePIC pfRICH mailing list
List archive
Re: [Eic-projdet-pfrich-l] Cancelled -- Engineering/Design Meeting -- 25 Mar 2024
- From: Wenliang Li <wenliang.b.li AT gmail.com>
- To: eic-projdet-pfrich-l AT lists.bnl.gov
- Subject: Re: [Eic-projdet-pfrich-l] Cancelled -- Engineering/Design Meeting -- 25 Mar 2024
- Date: Mon, 25 Mar 2024 13:37:03 -0400
Hi Kong,
Many thanks for the hard work! This is fantastic! Measurement results are intuitive.
Bill
On 3/25/24 13:33, Tu, Zhoudunming via Eic-projdet-pfrich-l wrote:
Dear Alex, all,
I was planning to show this set of slides for the mirror reflectivity test
today,
https://urldefense.com/v3/__https://docs.google.com/presentation/d/1txmQlj_4_saS3z1j63L1lmqj-awYylWZNEbi5NBV45E/edit?usp=sharing__;!!P4SdNyxKAPE!GiFOGBSUpHRr3Q1ldFVMb5CFeGAXpmZku_fTl4PLTkr5-pvO5mnl_rsMS5u8kfpKHt0ZcZXLLxyzvSxAuf-7ivk3U_eDlE1OpG3Yn6Kd$
So, let me post it here for everyone and the slides should be
self-explanatory. Let us know if there’s any question or comment.
My conclusion so far:
* When there’s another opportunity, we should try to finish this
controlled experiment on the deposition (thin vs thick Cr) and time we leave
the sample in the chamber (0 vs 24h).
* So far, the best mirror we have made is evaporation #7 (thin Cr, thin
Al, and left the sample in the chamber for 24h).
From SBU, I think Bill mentioned that we should ask for (push for) the real
deposition measurement and calibrate our understanding on the thickness.
From BNL, we are going to improve our mirror test stand in the next few
weeks. When finished, I plan to re-measure everything again in a systematic
way.
Sorry I couldn’t join last week due to the STAR collaboration meeting. If
anything that expects from me, please let me know.
Thank you.
Kong
From: Eic-projdet-pfrich-l <eic-projdet-pfrich-l-bounces AT lists.bnl.gov> on behalf
of Alex Eslinger via Eic-projdet-pfrich-l <eic-projdet-pfrich-l AT lists.bnl.gov>
Date: Monday, March 25, 2024 at 10:40 AM
To: eic-projdet-pfrich-l AT lists.bnl.gov <eic-projdet-pfrich-l AT lists.bnl.gov>
Subject: [Eic-projdet-pfrich-l] Cancelled -- Engineering/Design Meeting -- 25
Mar 2024
Good morning,
I am not feeling well today, and Alexander will not be available to run the
meeting for me today, so I need to cancel today’s meeting. If there are any
substantial updates that anyone would like to share, please send them to the
mailing list.
Apologies for the late notice.
Thanks,
Alex
_______________________________________________
Eic-projdet-pfrich-l mailing list
Eic-projdet-pfrich-l AT lists.bnl.gov
https://lists.bnl.gov/mailman/listinfo/eic-projdet-pfrich-l
-
[Eic-projdet-pfrich-l] Cancelled -- Engineering/Design Meeting -- 25 Mar 2024,
Alex Eslinger, 03/25/2024
-
Re: [Eic-projdet-pfrich-l] Cancelled -- Engineering/Design Meeting -- 25 Mar 2024,
Tu, Zhoudunming, 03/25/2024
- Re: [Eic-projdet-pfrich-l] Cancelled -- Engineering/Design Meeting -- 25 Mar 2024, Wenliang Li, 03/25/2024
- Re: [Eic-projdet-pfrich-l] Cancelled -- Engineering/Design Meeting -- 25 Mar 2024, Kiselev, Alexander, 03/26/2024
-
Re: [Eic-projdet-pfrich-l] Cancelled -- Engineering/Design Meeting -- 25 Mar 2024,
Tu, Zhoudunming, 03/25/2024
Archive powered by MHonArc 2.6.24.