Skip to Content.
Sympa Menu

eic-projdet-pfrich-l - Re: [Eic-projdet-pfrich-l] Reminder: Engineering/Design Meeting -- 29 April 2024 1300 EST

eic-projdet-pfrich-l AT lists.bnl.gov

Subject: ePIC pfRICH mailing list

List archive

Chronological Thread  
  • From: Wenliang Li <wenliang.b.li AT gmail.com>
  • To: Alex Eslinger <eslinger AT jlab.org>, "eic-projdet-pfrich-l AT lists.bnl.gov" <eic-projdet-pfrich-l AT lists.bnl.gov>, "eic-projdet-pfrich-mechanical-design-l AT lists.bnl.gov" <eic-projdet-pfrich-mechanical-design-l AT lists.bnl.gov>
  • Subject: Re: [Eic-projdet-pfrich-l] Reminder: Engineering/Design Meeting -- 29 April 2024 1300 EST
  • Date: Tue, 30 Apr 2024 21:32:42 -0400

Dear all,

Please see the meeting minutes from this week's pfRICH engineering meeting.

Many thanks

Bill

--------------------------------------------------------------------------------------------------

Summary

The team discussed updating the schedule to meet the August deadline for the construction project. Sushrut suggested moving the tests to SBU and using a two by two sensor plane prototype for sealing tests. Bill requested a four-week extension for evaporator upgrade to be included in the coating schedule. Alex raised concerns about potential heat impact on detector systems during the beam pipe bakeout procedure.

Key Points
• Alex initiates a discussion about updating the schedule to ensure meeting the August deadline and addresses the impact of delivery delays on the project timeline. (0:24)

• Sushrut expresses the necessity of conducting sealing tests, proposes sending one end ring first for testing, and suggests shifting the tests to SBU if needed. (4:01)

• Sushrut suggests moving the sealing tests to SBU and provides details on the timeline for manufacturing the sensor plane prototype. (10:32)

• Sushrut explains the idea of conducting a sealing test using a two by two sensor plane prototype and acrylic sheet to check the seal's strength under pressure. (15:51)

• Alex suggests pressurizing instead of vacuuming for the test, with others agreeing on applying regulated pressure for the experiment. (21:32)

• Sushrut suggests informing the sealing choice for sensors and ensuring the bolting pattern is suitable, emphasizing the importance of avoiding late-stage redesigns in the process. (31:45)

• Bill and Preet updates the team on the coating schedule, requesting an extension of four weeks due to ongoing upgrades and pending tasks, including testing and mounting mirror brackets. (47:39)

• Alex raises concerns about the potential heat impact on detector systems during the beam pipe bakeout procedure, seeking clarification before making official announcements. (53:24)


Next Steps
• Sushrut to ship the end rings by the end of this week or next week for the sealing tests. (6:14)

• Sushrut to shift the sealing tests to SBU and figure out in June if a visit is needed or instructions can be provided to Charles, Bill, and their team at SPU. (13:29)

• Sushrut to talk to Alex and Charles to refine the plan for doing the sealing tests and present a better version in the upcoming meetings. (33:53)

• Preet to prepare 70 by 70 centimeter samples for future testing without the need for precision cutting, as discussed with Alexander and Bill. (42:07)

• Benny to ask Makoto about the costs implications of the increasing number of tiles and the recent limitations communicated. (1:07:44)

On 4/29/24 15:54, Alex Eslinger via Eic-projdet-pfrich-l wrote:
All,

Please see the recorded meeting at this link:

https://urldefense.com/v3/__https://jlab-org.zoomgov.com/rec/share/nYqUEBLR6obgUtjRscgwtocKj48f6136dTfd0k1KhLcPmM96fyxTMyXIExlvD5cx.qPXGax5K8AdNfToi__;!!P4SdNyxKAPE!FfnxW34aWfI9k4Ts-N2etde1-V7MEW-qNUsey4ZhBCL0Vs6C4YvEKvoTzNmnnXjQZRh-wyRDDeXm32NiNXAiWgF-gSdEXVKJgQ$
Passcode: cRzW?*F3

Thanks,
Alex

From: Eic-projdet-pfrich-l <eic-projdet-pfrich-l-bounces AT lists.bnl.gov> On
Behalf Of Alex Eslinger via Eic-projdet-pfrich-l
Sent: Monday, April 29, 2024 8:51 AM
To: eic-projdet-pfrich-l AT lists.bnl.gov
Subject: [EXTERNAL] [Eic-projdet-pfrich-l] Reminder: Engineering/Design
Meeting -- 29 April 2024 1300 EST

Good morning,

Please join me for our pfRICH engineering and design meeting today, 22 April
2024 at 1300 EST.

Discussion topics include updates from SBU, Purdue, and a schedule update.

Indico:
https://indico.bnl.gov/event/23099/<https://urldefense.proofpoint.com/v2/url?u=https-3A__indico.bnl.gov_event_23099_&d=DwMFAg&c=CJqEzB1piLOyyvZjb8YUQw&r=3cGlHQS61cEGruAueGn1zrst6RAl58wWoQ3N3MFqMUo&m=E6-zb5BiQa6gpRZsyaY6zT_AVgyKIuJMqPEzbV2DaJhCGULElyXNGG-7bx-FQ2IK&s=v5gA321zH0qVuVtr-A64pPSQOSMGe4xO6fgaO6YbhZ0&e=>
Zoom:
https://urldefense.com/v3/__https://jlab-org.zoomgov.com/j/16028326423?pwd=cmpHc0s3cWMyQWV0enhvQlVmeVJpQT09__;!!P4SdNyxKAPE!FfnxW34aWfI9k4Ts-N2etde1-V7MEW-qNUsey4ZhBCL0Vs6C4YvEKvoTzNmnnXjQZRh-wyRDDeXm32NiNXAiWgF-gSc8ACiRhg$

<https://urldefense.com/v3/__https:/jlab-org.zoomgov.com/j/16028326423?pwd=cmpHc0s3cWMyQWV0enhvQlVmeVJpQT09__;!!P4SdNyxKAPE!EgsUHTM8qHLyTC8lPq-J3tYYdXl894saHnUuotWh5FQxAQT73KDZH5t8vmx70aqgbNX13qvVRhKLg7yUJENmVNCbt4TaFUXvag$>

Meeting ID: 160 2832 6423 Passcode: 3DdgRUoscP

Thanks,
Alex




_______________________________________________
Eic-projdet-pfrich-l mailing list
Eic-projdet-pfrich-l AT lists.bnl.gov
https://lists.bnl.gov/mailman/listinfo/eic-projdet-pfrich-l




Archive powered by MHonArc 2.6.24.

Top of Page