Re: [Eic-projdet-pfrich-l] [Eic-projdet-pfrich-mechanical-design-l] Reminder: Engineering/Design Meeting -- 29 April 2024 1300 EST
- From: Charles Joseph Naim <charlesjoseph.naim AT stonybrook.edu>
- To: Wenliang Li <wenliang.b.li AT gmail.com>
- Cc: Alex Eslinger <eslinger AT jlab.org>, "eic-projdet-pfrich-l AT lists.bnl.gov" <eic-projdet-pfrich-l AT lists.bnl.gov>, "eic-projdet-pfrich-mechanical-design-l AT lists.bnl.gov" <eic-projdet-pfrich-mechanical-design-l AT lists.bnl.gov>
- Subject: Re: [Eic-projdet-pfrich-l] [Eic-projdet-pfrich-mechanical-design-l] Reminder: Engineering/Design Meeting -- 29 April 2024 1300 EST
- Date: Tue, 30 Apr 2024 21:41:16 -0400
Thank you Bill, but this sentence isn't quite accurate:
Next Steps
• Sushrut to ship the end rings by the end of this week or next week for the sealing tests. (6:14)
Currently, there are no plans to conduct these tests at Stony Brook.
Charles
————————————————————————Dr. Charles-Joseph Naïm
————————————————————————
Research associate
Center for Frontiers in Nuclear Science (CFNS)
Stony Brook University
Dept. of Physics and Astronomy
Stony Brook, NY 11794-3800, USA
Office C-117
Dept. of Physics and Astronomy
Stony Brook, NY 11794-3800, USA
Office C-117
Phone: +1 347 273 0887
Zoom ID: 391 825 8156 (pin: 1643)
————————————————————————
On Tue 30 Apr 2024 at 9:32 PM, Wenliang Li via Eic-projdet-pfrich-mechanical-design-l <eic-projdet-pfrich-mechanical-design-l AT lists.bnl.gov> wrote:
Dear all,
Please see the meeting minutes from this week's pfRICH engineering meeting.
Many thanks
Bill
--------------------------------------------------------------------------------------------------
Summary
The team discussed updating the schedule to meet the August deadline for
the construction project. Sushrut suggested moving the tests to SBU and
using a two by two sensor plane prototype for sealing tests. Bill
requested a four-week extension for evaporator upgrade to be included in
the coating schedule. Alex raised concerns about potential heat impact
on detector systems during the beam pipe bakeout procedure.
Key Points
• Alex initiates a discussion about updating the schedule to ensure
meeting the August deadline and addresses the impact of delivery delays
on the project timeline. (0:24)
• Sushrut expresses the necessity of conducting sealing tests, proposes
sending one end ring first for testing, and suggests shifting the tests
to SBU if needed. (4:01)
• Sushrut suggests moving the sealing tests to SBU and provides details
on the timeline for manufacturing the sensor plane prototype. (10:32)
• Sushrut explains the idea of conducting a sealing test using a two by
two sensor plane prototype and acrylic sheet to check the seal's
strength under pressure. (15:51)
• Alex suggests pressurizing instead of vacuuming for the test, with
others agreeing on applying regulated pressure for the experiment. (21:32)
• Sushrut suggests informing the sealing choice for sensors and ensuring
the bolting pattern is suitable, emphasizing the importance of avoiding
late-stage redesigns in the process. (31:45)
• Bill and Preet updates the team on the coating schedule, requesting an
extension of four weeks due to ongoing upgrades and pending tasks,
including testing and mounting mirror brackets. (47:39)
• Alex raises concerns about the potential heat impact on detector
systems during the beam pipe bakeout procedure, seeking clarification
before making official announcements. (53:24)
Next Steps
• Sushrut to ship the end rings by the end of this week or next week for
the sealing tests. (6:14)
• Sushrut to shift the sealing tests to SBU and figure out in June if a
visit is needed or instructions can be provided to Charles, Bill, and
their team at SPU. (13:29)
• Sushrut to talk to Alex and Charles to refine the plan for doing the
sealing tests and present a better version in the upcoming meetings. (33:53)
• Preet to prepare 70 by 70 centimeter samples for future testing
without the need for precision cutting, as discussed with Alexander and
Bill. (42:07)
• Benny to ask Makoto about the costs implications of the increasing
number of tiles and the recent limitations communicated. (1:07:44)
On 4/29/24 15:54, Alex Eslinger via Eic-projdet-pfrich-l wrote:
> All,
>
> Please see the recorded meeting at this link:
>
> https://urldefense.com/v3/__https://jlab-org.zoomgov.com/rec/share/nYqUEBLR6obgUtjRscgwtocKj48f6136dTfd0k1KhLcPmM96fyxTMyXIExlvD5cx.qPXGax5K8AdNfToi__;!!P4SdNyxKAPE!FfnxW34aWfI9k4Ts-N2etde1-V7MEW-qNUsey4ZhBCL0Vs6C4YvEKvoTzNmnnXjQZRh-wyRDDeXm32NiNXAiWgF-gSdEXVKJgQ$
> Passcode: cRzW?*F3
>
> Thanks,
> Alex
>
> From: Eic-projdet-pfrich-l <eic-projdet-pfrich-l-bounces AT lists.bnl.gov> On Behalf Of Alex Eslinger via Eic-projdet-pfrich-l
> Sent: Monday, April 29, 2024 8:51 AM
> To: eic-projdet-pfrich-l AT lists.bnl.gov
> Subject: [EXTERNAL] [Eic-projdet-pfrich-l] Reminder: Engineering/Design Meeting -- 29 April 2024 1300 EST
>
> Good morning,
>
> Please join me for our pfRICH engineering and design meeting today, 22 April 2024 at 1300 EST.
>
> Discussion topics include updates from SBU, Purdue, and a schedule update.
>
> Indico: https://indico.bnl.gov/event/23099/<https://urldefense.proofpoint.com/v2/url?u=https-3A__indico.bnl.gov_event_23099_&d=DwMFAg&c=CJqEzB1piLOyyvZjb8YUQw&r=3cGlHQS61cEGruAueGn1zrst6RAl58wWoQ3N3MFqMUo&m=E6-zb5BiQa6gpRZsyaY6zT_AVgyKIuJMqPEzbV2DaJhCGULElyXNGG-7bx-FQ2IK&s=v5gA321zH0qVuVtr-A64pPSQOSMGe4xO6fgaO6YbhZ0&e=>
> Zoom: https://urldefense.com/v3/__https://jlab-org.zoomgov.com/j/16028326423?pwd=cmpHc0s3cWMyQWV0enhvQlVmeVJpQT09__;!!P4SdNyxKAPE!FfnxW34aWfI9k4Ts-N2etde1-V7MEW-qNUsey4ZhBCL0Vs6C4YvEKvoTzNmnnXjQZRh-wyRDDeXm32NiNXAiWgF-gSc8ACiRhg$ <https://urldefense.com/v3/__https:/jlab-org.zoomgov.com/j/16028326423?pwd=cmpHc0s3cWMyQWV0enhvQlVmeVJpQT09__;!!P4SdNyxKAPE!EgsUHTM8qHLyTC8lPq-J3tYYdXl894saHnUuotWh5FQxAQT73KDZH5t8vmx70aqgbNX13qvVRhKLg7yUJENmVNCbt4TaFUXvag$>
>
> Meeting ID: 160 2832 6423 Passcode: 3DdgRUoscP
>
> Thanks,
> Alex
>
>
>
>
> _______________________________________________
> Eic-projdet-pfrich-l mailing list
> Eic-projdet-pfrich-l AT lists.bnl.gov
> https://lists.bnl.gov/mailman/listinfo/eic-projdet-pfrich-l
--
Eic-projdet-pfrich-mechanical-design-l mailing list
Eic-projdet-pfrich-mechanical-design-l AT lists.bnl.gov
https://lists.bnl.gov/mailman/listinfo/eic-projdet-pfrich-mechanical-design-l
-
[Eic-projdet-pfrich-l] Reminder: Engineering/Design Meeting -- 29 April 2024 1300 EST,
Alex Eslinger, 04/29/2024
-
Re: [Eic-projdet-pfrich-l] Reminder: Engineering/Design Meeting -- 29 April 2024 1300 EST,
Alex Eslinger, 04/29/2024
-
Re: [Eic-projdet-pfrich-l] Reminder: Engineering/Design Meeting -- 29 April 2024 1300 EST,
Wenliang Li, 04/30/2024
- Re: [Eic-projdet-pfrich-l] [Eic-projdet-pfrich-mechanical-design-l] Reminder: Engineering/Design Meeting -- 29 April 2024 1300 EST, Charles Joseph Naim, 04/30/2024
-
Re: [Eic-projdet-pfrich-l] Reminder: Engineering/Design Meeting -- 29 April 2024 1300 EST,
Wenliang Li, 04/30/2024
-
Re: [Eic-projdet-pfrich-l] Reminder: Engineering/Design Meeting -- 29 April 2024 1300 EST,
Alex Eslinger, 04/29/2024
Archive powered by MHonArc 2.6.24.