sphenix-emcal-l AT lists.bnl.gov
Subject: sPHENIX EMCal discussion
List archive
Re: [Sphenix-emcal-l] Beam Test Design review - EMCal movements
- From: John Haggerty <haggerty AT bnl.gov>
- To: sphenix-emcal-l AT lists.bnl.gov
- Subject: Re: [Sphenix-emcal-l] Beam Test Design review - EMCal movements
- Date: Wed, 27 Sep 2017 19:36:12 -0400
On 9/27/17 5:12 PM, Sean Stoll wrote:
_Rear Position / With __HCal__(Mount to Inner __HCal__)_
•Translate (X) to move out of beam (HcalOnly) ?
•Rotate 90deg for calibration ?
Here are some thoughts; I agree with the first part. For the second part:
I was hoping to talk us out of moving the EMCAL relative to the IHCAL when it's downstream, that we could get that out of our system while it's on the 2c table, and when it moves downstream, it's just where it is, and if we do any tilting, we tilt the whole blue table a few degrees either way. And I think we should be able to get our fill of HCAL-alone data while the EMCAL is upstream on the 2c table; we can move it aside at night, for example.
The one motion I think we might not be able to do without is to be able to move the EMCAL left and right in front of the IHCAL, because they can't really rig it into place to mm. We had tracks for the IHCAL in the 2016 test, it might work to just move the EMCAL+IHCAL assembly.
I hope we can come to consensus on this tomorrow.
--
John Haggerty
email: haggerty AT bnl.gov
cell: 631 741 3358
-
[Sphenix-emcal-l] Beam Test Design review - EMCal movements,
Sean Stoll, 09/27/2017
-
Re: [Sphenix-emcal-l] Beam Test Design review - EMCal movements,
John Haggerty, 09/27/2017
- Re: [Sphenix-emcal-l] Beam Test Design review - EMCal movements, Sean Stoll, 09/28/2017
-
Re: [Sphenix-emcal-l] Beam Test Design review - EMCal movements,
John Haggerty, 09/27/2017
Archive powered by MHonArc 2.6.24.