Re: [Sphenix-emcal-l] EMCal Sector 0 dryfit blocks
- From: "Ilardo, Matthew" <milardo AT bnl.gov>
- To: "Lenz, Michael D" <mlenz AT bnl.gov>
- Cc: "La Bounty, James" <labounty AT bnl.gov>, "sphenix-emcal-l AT lists.bnl.gov" <sphenix-emcal-l AT lists.bnl.gov>, "Lenz, William" <wlenz AT bnl.gov>
- Subject: Re: [Sphenix-emcal-l] EMCal Sector 0 dryfit blocks
- Date: Mon, 20 May 2019 15:36:49 +0000
I have all the parts processed, what surfaces are most important? Would you like to come here around 2 to go over the report you would like?
From: Michael Lenz <mlenz AT rcf.rhic.bnl.gov>
Hi Matt, I know you said processing the survey results was very labor intensive, but as you can read below, we are at a critical point in our assembly process. If you are not able to provide the survey results by this afternoon, please let us know asap. We need to move forward ! Thank you ! Mike PS Does processing this type of survey usually take this long (2 weeks) ? We would need to know this for future requests ! On 5/20/2019 9:59 AM, Sickles, Anne M wrote:
|
-
[Sphenix-emcal-l] EMCal Sector 0 dryfit blocks,
Sean Stoll, 05/17/2019
- [Sphenix-emcal-l] Fwd: EMCal Sector 0 dryfit blocks, Sean Stoll, 05/17/2019
-
Re: [Sphenix-emcal-l] EMCal Sector 0 dryfit blocks,
David Morrison, 05/20/2019
-
Re: [Sphenix-emcal-l] EMCal Sector 0 dryfit blocks,
Sickles, Anne M, 05/20/2019
-
Re: [Sphenix-emcal-l] EMCal Sector 0 dryfit blocks,
Michael Lenz, 05/20/2019
- Re: [Sphenix-emcal-l] EMCal Sector 0 dryfit blocks, Ilardo, Matthew, 05/20/2019
-
Re: [Sphenix-emcal-l] EMCal Sector 0 dryfit blocks,
Michael Lenz, 05/20/2019
-
Re: [Sphenix-emcal-l] EMCal Sector 0 dryfit blocks,
Sickles, Anne M, 05/20/2019
- <Possible follow-up(s)>
- Re: [Sphenix-emcal-l] EMCal Sector 0 dryfit blocks, eric thorsland, 05/20/2019
Archive powered by MHonArc 2.6.24.