Skip to Content.
Sympa Menu

sphenix-emcal-l - [[Sphenix-emcal-l] ] Plot_Approval_DNP_Talk

sphenix-emcal-l AT lists.bnl.gov

Subject: sPHENIX EMCal discussion

List archive

Chronological Thread  
  • From: "Regmi, Sijan" <sr276419 AT ohio.edu>
  • To: "sphenix-emcal-l AT lists.bnl.gov" <sphenix-emcal-l AT lists.bnl.gov>
  • Subject: [[Sphenix-emcal-l] ] Plot_Approval_DNP_Talk
  • Date: Wed, 2 Oct 2024 20:29:28 +0000

Good afternoon, All,

 

I would like to get approval for one plot in my DNP talk. I presented this at today’s mini calo meeting. I would like to replace one plot on slide 5 from my Monday’s presentation (plot will be on 5th slide in my DNP talk). I need approval for the plot on the right (the left one is already approved).

 

Previously, I had a plot showing ratio of “measured de-calibration” to “true de-calibration” after few iterations to indicate input de-calibration in EMCal was smoothed out in pi0 embedded HIJING. Now, I want to replace that with pi0 mass plot for all EMCal towers obtained after 9 iterations. This new plot shows de-calibration smooths out after 9 iterations after de-calibration is applied and pi0 peak value converges to 135 MeV in those regions where de-calibration is applied.

The current plot conveys same meaning as previous plot (one I had on presentation on Monday), but I believe current plot I want to have is easier to understand for audience than what I had before.

Please find the plot in the attachment and let me know is there is any question or need more information.

Regards

Sijan Regmi

 

 

 

 

Attachment: Sijan_Regmi_DNP_Talk_CaloCalib_Plot_Approval.pdf
Description: Sijan_Regmi_DNP_Talk_CaloCalib_Plot_Approval.pdf




Archive powered by MHonArc 2.6.24.

Top of Page