Edward,

 

Boy do I hate to take on the job of spoiler but here goes …

 

Sal was asked to look over some of the fibers and while they look fine on the source end, the fibers at the tile end stick out of the connectors and are rough cut at a 45 degree angle. It looks like the cut and polish procedure was skipped. If that’s true it would certainly explain any observed disparities in tile illumination.

 

I hope this is a misunderstanding on my part.

 

Steve Boose

sPHENIX Experiment

Brookhaven National Laboratory

BLDG 510C

Upton, NY 11973

Office: 631 344-2897

 

From: sPHENIX-HCal-l <sphenix-hcal-l-bounces AT lists.bnl.gov> On Behalf Of Kistenev, Edouard
Sent: Wednesday, February 3, 2021 9:37 AM
To: Bathe, Stefan <bathe AT bnl.gov>; sphenix-hcal-l AT lists.bnl.gov
Subject: Re: [Sphenix-hcal-l] 16/32 oHCal sectors assembled

 

Stephan, I am usually a spoiler and always able to find something forgotten like muon data with two sectors on top of each other. But this time - what the correct word - kudos!

 

Edward

 

And we are ready to build the cradle - right.

 


From: sPHENIX-HCal-l <sphenix-hcal-l-bounces AT lists.bnl.gov> on behalf of Stefan Bathe <bathe AT bnl.gov>
Sent: Tuesday, February 2, 2021 10:28 PM
To: sphenix-hcal-l AT lists.bnl.gov <sphenix-hcal-l AT lists.bnl.gov>
Subject: [Sphenix-hcal-l] 16/32 oHCal sectors assembled

 

Dear HCal friends,

I’d like to share the good news that as of tonight, 16 out fo 32 oHCal sectors have been assembled, tested, and have cosmics calibration data taken.  In other words:  halfway done!
This has truly been a collaborative effort with many, many people contributing, from numerous institutions.  It’s been a real pleasure seeing the detector come together like this.
Way to go, oHCal, and way to go, sPHENIX!

Regards,
Stefan

--
---------------------------------------------------------------------------------
Stefan Bathe
Professor of Physics
Baruch College, CUNY

Baruch:                                     BNL:
17 Lexington Ave                      Bldg. 510
office 940                                  office 2-229
phone 646-660-6272                phone 631-344-8490
----------------------------------------------------------------------------------

_______________________________________________
sPHENIX-HCal-l mailing list
sPHENIX-HCal-l AT lists.bnl.gov
https://lists.bnl.gov/mailman/listinfo/sphenix-hcal-l




Archive powered by MHonArc 2.6.24.

Top of Page