Re: [Sphenix-hcal-l] 16/32 oHCal sectors assembled
- From: "Boose, Stephen" <boose AT bnl.gov>
- To: "Kistenev, Edouard" <kistenev AT bnl.gov>, "Bathe, Stefan" <bathe AT bnl.gov>, "sphenix-hcal-l AT lists.bnl.gov" <sphenix-hcal-l AT lists.bnl.gov>
- Subject: Re: [Sphenix-hcal-l] 16/32 oHCal sectors assembled
- Date: Wed, 3 Feb 2021 15:07:56 +0000
Edward,
Boy do I hate to take on the job of spoiler but here goes …
Sal was asked to look over some of the fibers and while they look fine on the source end, the fibers at the tile end stick out of the connectors and are rough cut at a 45 degree angle. It looks like the cut and polish procedure was skipped. If that’s true it would certainly explain any observed disparities in tile illumination.
I hope this is a misunderstanding on my part.
Steve Boose sPHENIX Experiment Brookhaven National Laboratory BLDG 510C Upton, NY 11973 Office: 631 344-2897
From: sPHENIX-HCal-l <sphenix-hcal-l-bounces AT lists.bnl.gov>
On Behalf Of Kistenev, Edouard
Stephan, I am usually a spoiler and always able to find something forgotten like muon data with two sectors on top of each other. But this time - what the correct word - kudos!
Edward
And we are ready to build the cradle - right.
From: sPHENIX-HCal-l <sphenix-hcal-l-bounces AT lists.bnl.gov> on behalf of Stefan Bathe <bathe AT bnl.gov>
Dear HCal friends, |
-
[Sphenix-hcal-l] 16/32 oHCal sectors assembled,
Stefan Bathe, 02/02/2021
- Re: [Sphenix-hcal-l] 16/32 oHCal sectors assembled, Xiaochun He, 02/03/2021
-
Re: [Sphenix-hcal-l] 16/32 oHCal sectors assembled,
Kistenev, Edouard, 02/03/2021
-
Re: [Sphenix-hcal-l] 16/32 oHCal sectors assembled,
Boose, Stephen, 02/03/2021
-
Re: [Sphenix-hcal-l] 16/32 oHCal sectors assembled,
Stefan Bathe, 02/03/2021
-
Re: [Sphenix-hcal-l] 16/32 oHCal sectors assembled,
Boose, Stephen, 02/03/2021
-
Re: [Sphenix-hcal-l] 16/32 oHCal sectors assembled,
Kistenev, Edouard, 02/07/2021
- Re: [Sphenix-hcal-l] 16/32 oHCal sectors assembled, Boose, Stephen, 02/08/2021
-
Re: [Sphenix-hcal-l] 16/32 oHCal sectors assembled,
Kistenev, Edouard, 02/07/2021
-
Re: [Sphenix-hcal-l] 16/32 oHCal sectors assembled,
Boose, Stephen, 02/03/2021
-
Re: [Sphenix-hcal-l] 16/32 oHCal sectors assembled,
Stefan Bathe, 02/03/2021
-
Re: [Sphenix-hcal-l] 16/32 oHCal sectors assembled,
Boose, Stephen, 02/03/2021
Archive powered by MHonArc 2.6.24.