Hi Steve,
This is just a one-off bundle where, I guess, Uniplast forgot to cut off the fibers at the ferrule end and polish them.—One in more than 160 we have used so far, which were all fine.—We could have cut an polished ourselves, but we thought Sal could probably do a better job than us. I think that’s how that bundle made it to Sal.
So in summary, no reason for concern.
Regards,
Stefan
On Feb 3, 2021, at 10:07 AM, Boose, Stephen <boose AT bnl.gov> wrote:Edward,Boy do I hate to take on the job of spoiler but here goes …Sal was asked to look over some of the fibers and while they look fine on the source end, the fibers at the tile end stick out of the connectors and are rough cut at a 45 degree angle. It looks like the cut and polish procedure was skipped. If that’s true it would certainly explain any observed disparities in tile illumination.I hope this is a misunderstanding on my part.Steve BoosesPHENIX ExperimentBrookhaven National LaboratoryBLDG 510CUpton, NY 11973Office: 631 344-2897From: sPHENIX-HCal-l <sphenix-hcal-l-bounces AT lists.bnl.gov> On Behalf Of Kistenev, Edouard
Sent: Wednesday, February 3, 2021 9:37 AM
To: Bathe, Stefan <bathe AT bnl.gov>; sphenix-hcal-l AT lists.bnl.gov
Subject: Re: [Sphenix-hcal-l] 16/32 oHCal sectors assembledStephan, I am usually a spoiler and always able to find something forgotten like muon data with two sectors on top of each other. But this time - what the correct word - kudos!EdwardAnd we are ready to build the cradle - right.From: sPHENIX-HCal-l <sphenix-hcal-l-bounces AT lists.bnl.gov> on behalf of Stefan Bathe <bathe AT bnl.gov>
Sent: Tuesday, February 2, 2021 10:28 PM
To: sphenix-hcal-l AT lists.bnl.gov <sphenix-hcal-l AT lists.bnl.gov>
Subject: [Sphenix-hcal-l] 16/32 oHCal sectors assembledDear HCal friends,
I’d like to share the good news that as of tonight, 16 out fo 32 oHCal sectors have been assembled, tested, and have cosmics calibration data taken. In other words: halfway done!
This has truly been a collaborative effort with many, many people contributing, from numerous institutions. It’s been a real pleasure seeing the detector come together like this.
Way to go, oHCal, and way to go, sPHENIX!
Regards,
Stefan
--
---------------------------------------------------------------------------------
Stefan Bathe
Professor of Physics
Baruch College, CUNY
Baruch: BNL:
17 Lexington Ave Bldg. 510
office 940 office 2-229
phone 646-660-6272 phone 631-344-8490
----------------------------------------------------------------------------------
_______________________________________________
sPHENIX-HCal-l mailing list
sPHENIX-HCal-l AT lists.bnl.gov
https://lists.bnl.gov/mailman/listinfo/sphenix-hcal-l
-
[Sphenix-hcal-l] 16/32 oHCal sectors assembled,
Stefan Bathe, 02/02/2021
- Re: [Sphenix-hcal-l] 16/32 oHCal sectors assembled, Xiaochun He, 02/03/2021
-
Re: [Sphenix-hcal-l] 16/32 oHCal sectors assembled,
Kistenev, Edouard, 02/03/2021
-
Re: [Sphenix-hcal-l] 16/32 oHCal sectors assembled,
Boose, Stephen, 02/03/2021
-
Re: [Sphenix-hcal-l] 16/32 oHCal sectors assembled,
Stefan Bathe, 02/03/2021
-
Re: [Sphenix-hcal-l] 16/32 oHCal sectors assembled,
Boose, Stephen, 02/03/2021
-
Re: [Sphenix-hcal-l] 16/32 oHCal sectors assembled,
Kistenev, Edouard, 02/07/2021
- Re: [Sphenix-hcal-l] 16/32 oHCal sectors assembled, Boose, Stephen, 02/08/2021
-
Re: [Sphenix-hcal-l] 16/32 oHCal sectors assembled,
Kistenev, Edouard, 02/07/2021
-
Re: [Sphenix-hcal-l] 16/32 oHCal sectors assembled,
Boose, Stephen, 02/03/2021
-
Re: [Sphenix-hcal-l] 16/32 oHCal sectors assembled,
Stefan Bathe, 02/03/2021
-
Re: [Sphenix-hcal-l] 16/32 oHCal sectors assembled,
Boose, Stephen, 02/03/2021
Archive powered by MHonArc 2.6.24.