Skip to Content.
Sympa Menu

sphenix-l - [Sphenix-l] PHENIX R&R and sPHENIX Planning

sphenix-l AT lists.bnl.gov

Subject: sPHENIX is a new detector at RHIC.

List archive

Chronological Thread  
  • From: "Lynch, Don" <dlynch AT bnl.gov>
  • To: "Lynch, Don" <dlynch AT bnl.gov>, "Boose, Stephen" <boose AT bnl.gov>, "Franz, Achim" <afranz AT bnl.gov>, "Haggerty, John" <haggerty AT bnl.gov>, Mike Leitch <leitch AT rcf.rhic.bnl.gov>, "Giannotti, Paul" <gia AT bnl.gov>, "La Bounty, James" <labounty AT bnl.gov>, "Pisani, Robert" <pisani AT bnl.gov>, "Polizzo, Salvatore A" <sapolizzo AT bnl.gov>, "Tradeski Jr, John" <tradeski AT bnl.gov>, "Lenz, Michael D" <mlenz AT bnl.gov>, "Toldo, Frank A" <fatoldo AT bnl.gov>, "Walter Sondheim" <sondheim AT lanl.gov>, "Woody, Craig" <woody AT bnl.gov>, "Ruggiero, Richard" <ruggiero AT bnl.gov>, itaru <itaru AT bnl.gov>, "Purschke, Martin" <purschke AT bnl.gov>, "Sullivan, Patrick T (DOE)" <ptsullivan AT bnl.gov>, "Phillips, David B" <phillips AT bnl.gov>, "Pontieri, Chris" <cpontieri AT bnl.gov>, "Chiu, Mickey" <chiu AT rcf.rhic.bnl.gov>, "Morrison, David" <morrison AT bnl.gov>, "Mannel, Eric" <mannel AT bnl.gov>, Klaus Dehmelt <klaus.dehmelt AT stonybrook.edu>, "Poblaguev, Andrei" <poblaguev AT bnl.gov>, "Cirnigliaro, Peter P" <cirn AT bnl.gov>, "Seniuk, Chris (BHSO)" <Chris.Seniuk AT science.doe.gov>, "VanEssendelft, Melvin J" <mvaness AT bnl.gov>, "James.Sowinski AT science.doe.gov" <James.Sowinski AT science.doe.gov>, "Streckenbach, Brian" <bstreckenbach AT bnl.gov>, "Mills, James A" <mills AT bnl.gov>, "O'Brien, Edward" <eobrien AT bnl.gov>
  • Cc: "sphenix-l AT lists.bnl.gov" <sphenix-l AT lists.bnl.gov>, "Folz, Charles" <cfolz AT bnl.gov>
  • Subject: [Sphenix-l] PHENIX R&R and sPHENIX Planning
  • Date: Thu, 8 Jun 2017 16:10:15 +0000

Hi all,

Beginning today, we will be combining the weekly R&R planning meeting with a weekly sPHENIX planning meeting. This reflects the progress of the sPHENIX project from the conceptual phase to the design phase. We are currently fabricating pre-production prototypes for several sPHENIX subsystems that are expected to be the same or nearly the same as the production components. Along with this we will need to be setting up space around the lab to handle these components, designing assembly and handling fixtures as necessary and planning for the labor required for these efforts (sPHENIX techs, CAD techs and bargaining unit crafts). 

The INDICO page that was set up for PHENIX R&R has been modified to reflect that we will be planning both R&R and sPHENIX tasks. We will continue to use the same Bluejeans link that is already in place for R&R. Slides used at his meeting will be found on the Indico page by following the link below and navigating from there to today’s meeting.

 https://indico.bnl.gov/categoryDisplay.py?categId=168  




-Don Lynch


  • [Sphenix-l] PHENIX R&R and sPHENIX Planning, Lynch, Don, 06/08/2017

Archive powered by MHonArc 2.6.24.

Top of Page