Skip to Content.
Sympa Menu

sphenix-magnet-l - [Sphenix-magnet-l] Brief Summary of sPHENIX Magnet Biweekly meeting (Dec. 23, 2015)

sphenix-magnet-l AT lists.bnl.gov

Subject: sPHENIX discussion of the superconducting solenoid

List archive

Chronological Thread  
  • From: Kin Yip <kinyip AT bnl.gov>
  • To: "sphenix-magnet-l AT lists.bnl.gov" <sphenix-magnet-l AT lists.bnl.gov>
  • Subject: [Sphenix-magnet-l] Brief Summary of sPHENIX Magnet Biweekly meeting (Dec. 23, 2015)
  • Date: Wed, 23 Dec 2015 15:55:28 -0500

Agenda/powerpoint: https://indico.bnl.gov/conferenceDisplay.py?confId=1636


1. The actual field joint works, two times of welding with a pressure
test/leak check in between,
have finished. After the vacuum level went to 15 mTorr, Roberto has
switched to the Turbo pump.
On Monday, Mike Gaffney will witness the OFFICIAL pressure test/leak
check, with help from
the C-AD vacuum group who supplies the mass spectrometer etc.

2. R. Ceruti et. al. got the Heat Shield from the BNL central shop :

https://collab.external.bnl.gov/sites/sPHENIX-Magnet/Pictures/Heat%20Shield%20inside%20the%20junction%20box.jpg
At the moment, Ray cannot install this heat shield inside the junction box (or called "doghouse") as the strain
gauge cables (etc. ?) are not dealt with yet.

3. R. Ceruti has also reported that the mechanical portion (bellow) for the
linear potentiometers have been installed
but he and Sonny will calibrate the actual linear potentiometers and find
the mid-range etc. before they can
install them.

4. We discussed about the connections (without P. Giannotti's presence). In
Piyush's understanding, Paul will be
responsible for the strain gauge (including the few temperature required
for the strain gauge temperature correction);
whereas Piyush is responsible for the power supply and quench protection
connections.
5. We discussed about the BaBar refrigerator that Wes Craddock has mentioned to John Haggerty and asked whether we want it.
The consensus in the discussion seems to be that we want the refrigerator,
together the compressor (if available) etc.
Roberto said that this refrigerator can be a removable module that we may
use for sPHENIX or RHIC etc. The size of
the refrigerator just needs 1 truck and if the compressor is also to be
shipped, it'll be 2 trucks ... Roberto will
communicate with Wes and Wolfram Fischer (to see whether he's interested)
and Ed O'Brien will also talk with Wolfram
to see whether he's interested to share the cost of delivery :-)

6. From the Cost and Schedule Review in Nov., it's suggested that we
consider/evaluate the field mapping scope as well
as the issue of the standalone cryo plant vs a plant tapping into the RHIC
system.

Achim Franz will study and write a document to see whether we may get away
without doing the so-called CERN mapping
(that he's proposed for a while). Roberto has told us that with this BaBar
refrigerator, we can have an "in-between"
version such that we may move the Refrigerator out to cool the Solenoid
Magnet for extensive field mapping exercise
and then move it back to tap into the RHIC system after the field mapping
is done.
We heard that Wuzheng Meng may stay in BNL until Mar. 31 and there is a rumor that Holger Witte may help us with the
magnetic field calculation/simulation in the future.





Archive powered by MHonArc 2.6.24.

Top of Page