[Sphenix-magnet-l] pre-test inspection completed ... DAQ/Quench protection running overnight
- From: "Yip, Kin" <kinyip AT bnl.gov>
- To: "sphenix-magnet-l AT lists.bnl.gov" <sphenix-magnet-l AT lists.bnl.gov>
- Subject: [Sphenix-magnet-l] pre-test inspection completed ... DAQ/Quench protection running overnight
- Date: Sat, 13 Feb 2016 02:18:29 +0000
Hi,
The “pre-test inspection” procedures (the 1st traveler) have been completed and I scanned the pages into PDF :
https://collab.external.bnl.gov/sites/sPHENIX-Magnet/Shared%20Documents/100%20A%20Test/Pre-Test%20Inspection.pdf
I put my name down in a few places, mainly related to the fact that we don’t another pressure test/leak check as they Cryo group did one yesterday already. I put the Cryo Group’s document reference (for their pressure tests) 002-16 and wrote down the leak rate.
********************************************************************
Tonight, when Piyush and I left the sPHENIX Magnet (in Bldg. 912), we started the DAQ (on two PC’s) and Quench Protection at 7:46 pm with a readout freq. of 15 minutes and left them to run overnight, to see whether it crashed or not. It’ll be amusing if the Quench Protection system quenches J J
********************************************************************
It seems that while roughing pump A on the platform worked, the roughing pump B on the platform had problem. We are asking electrician(s) to fix it. ( The Cryo group could turn these two pumps on only after the Contactors were installed on Thursday, Feb. 11, 2016. )
Kin |