sphenix-magnet-l AT lists.bnl.gov
Subject: sPHENIX discussion of the superconducting solenoid
List archive
- 16/02/01
-
16/02/02
- [Sphenix-magnet-l] sPHENIX Magnet meeting on Feb. 3 at 1:30 pm in the 902 conference room, Yip, Kin
- [Sphenix-magnet-l] ohm to temperature (K), Kin Yip
- Re: [Sphenix-magnet-l] sPHENIX Magnet meeting on Feb. 3 at 1:30 pm in the 902 conference room, Giannotti, Paul
- Re: [Sphenix-magnet-l] sPHENIX Magnet meeting on Feb. 3 at 1:30 pm in the 902 conference room, Yip, Kin
-
16/02/03
- Re: [Sphenix-magnet-l] sPHENIX Magnet meeting on Feb. 3 at 1:30 pm in the 902 conference room, Makdisi, Yousef I
- [Sphenix-magnet-l] Brief Summary of sPHENIX Magnet Biweekly meeting (Feb. 3, 2016), Kin Yip
- [Sphenix-magnet-l] Wuzheng's newest force calculation for the High-Field-Test configuration (in 24 coils), Kin Yip
- 16/02/04
- 16/02/08
- 16/02/09
-
16/02/10
- [Sphenix-magnet-l] Strain gauge measurements in BaBar (in our BaBar server), Kin Yip
- [Sphenix-magnet-l] Brief Summary of sPHENIX Magnet Biweekly meeting (Feb. 10, 2016), Kin Yip
- [Sphenix-magnet-l] not just strain gauge ... but also linear pot., Kin Yip
- Re: [Sphenix-magnet-l] Some extracted Tie Rod Details from the documents, Yip, Kin
- 16/02/11
-
16/02/12
- [Sphenix-magnet-l] Axial Tie Rod Information, Mills, James A
- Re: [Sphenix-magnet-l] Axial Tie Rod Information, Kin Yip
- Re: [Sphenix-magnet-l] Axial Tie Rod Information, Mills, James A
- [Sphenix-magnet-l] marching towards the Cool-down, Kin Yip
- Re: [Sphenix-magnet-l] finished ASSRC checkoff list and the LESHC check list, Kin Yip
- [Sphenix-magnet-l] pre-test inspection completed ... DAQ/Quench protection running overnight, Yip, Kin
- 16/02/16
-
16/02/17
- Re: [Sphenix-magnet-l] sPHENIX, Kin Yip
- 16/02/18
- 16/02/19
Archive powered by MHonArc 2.6.24.