Nice. Good luck with the walkthrough and hopefully cooldown start soon.
Yousef
On Feb 2, 2016, at 8:50 PM, Yip, Kin <kinyip AT bnl.gov> wrote:
_______________________________________________Thanks a lot, Paul ! Nice pictures … Even the floor seems cleaner than a couple hours ago when I was there JKinFrom: Giannotti, Paul
Sent: Tuesday, February 02, 2016 8:44 PM
To: Yip, Kin <kinyip AT bnl.gov>; sphenix-magnet-l AT lists.bnl.gov
Subject: Re: [Sphenix-magnet-l] sPHENIX Magnet meeting on Feb. 3 at 1:30 pm in the 902 conference roomHere are some photos of the pre-walkthrough condition taken an hour ago.Kin,Defective Strain Gauges:
- TS03 (bad pin M on connector plug J4
- TS82 (bad connector pin j on connector plug J5)
- TS32 and TS92 (likely bad connections on Valve Box J6)
- TS80 (likely shorted at sensor itself)
Tie Rod temperature sensors TT01, TT02, TT03, TT04, TT05 are now wired into the Magnet Power Control & Data Acquisition Rack (not Cryo Rack).All Power & Control Racks inspected (EEI) and bar code stickers attached.Regards,PaulFrom: <sphenix-magnet-l-bounces AT lists.bnl.gov> on behalf of "Yip, Kin" <kinyip AT bnl.gov>
Date: Tuesday, February 2, 2016 at 3:06 PM
To: "sphenix-magnet-l AT lists.bnl.gov" <sphenix-magnet-l AT lists.bnl.gov>
Subject: [Sphenix-magnet-l] sPHENIX Magnet meeting on Feb. 3 at 1:30 pm in the 902 conference roomJust to remind you of our meeting tomorrow (Wed.) Jan. 27 at 1:30 pm in the 902 conference room.--- The roughing pump has been turned on since yesterday late afternoon/evening. I saw Paul Orfin and his guys as well asRich Meier are making the final connections.--- Paul Giannotti claimed that he’s just needed another hour.--- I’m looking for D. Phillips to put his barrier for the power lead (on the platform), put up the startle sign and anchor things properly.Agenda/powerpoint (https://indico.bnl.gov/conferenceDisplay.py?confId=1728):<image001.gif> Scheduling towards the cool-down/low-field test<image002.gif> Strain Gauge Connections ?<image002.gif> Pressure test/leak check (which is to be used for step 200 in the pre-test inspection Traveler) ?<image002.gif> Dave: Barrier for power lead/Steel anchored properly<image002.gif> Hypot/Impulse test on Thursday/Friday ?<image002.gif> Cut from ERL cryo line and welding ?<image002.gif> DAQ ready ?<image003.png> Cool-down next week<image003.png> AOBÞ “Safety walkthrough” at 2:30 pm (Bldg. 912)
Sphenix-magnet-l mailing list
Sphenix-magnet-l AT lists.bnl.gov
https://lists.bnl.gov/mailman/listinfo/sphenix-magnet-l
-
[Sphenix-magnet-l] sPHENIX Magnet meeting on Feb. 3 at 1:30 pm in the 902 conference room,
Yip, Kin, 02/02/2016
-
Re: [Sphenix-magnet-l] sPHENIX Magnet meeting on Feb. 3 at 1:30 pm in the 902 conference room,
Giannotti, Paul, 02/02/2016
-
Re: [Sphenix-magnet-l] sPHENIX Magnet meeting on Feb. 3 at 1:30 pm in the 902 conference room,
Yip, Kin, 02/02/2016
- Re: [Sphenix-magnet-l] sPHENIX Magnet meeting on Feb. 3 at 1:30 pm in the 902 conference room, Makdisi, Yousef I, 02/03/2016
-
Re: [Sphenix-magnet-l] sPHENIX Magnet meeting on Feb. 3 at 1:30 pm in the 902 conference room,
Yip, Kin, 02/02/2016
-
Re: [Sphenix-magnet-l] sPHENIX Magnet meeting on Feb. 3 at 1:30 pm in the 902 conference room,
Giannotti, Paul, 02/02/2016
Archive powered by MHonArc 2.6.24.