Re: [Sphenix-magnet-l] electrical/hypot tests are done --- voltage taps connected to the resistor board
- From: "Yip, Kin" <kinyip AT bnl.gov>
- To: "Yip, Kin" <kinyip AT bnl.gov>, "sphenix-magnet-l AT lists.bnl.gov" <sphenix-magnet-l AT lists.bnl.gov>
- Subject: Re: [Sphenix-magnet-l] electrical/hypot tests are done --- voltage taps connected to the resistor board
- Date: Tue, 7 Nov 2017 21:54:04 +0000
Hi,
I’ve found a couple typos in the voltage tap labelling and Sonny’s corrected the .xlsx and the .vsd (visio) and I’ve put them all in the zip file :
Kin
From: Kin Yip [mailto:kinyip AT bnl.gov]
Hi,
Hi Kin Tests are done Piyush signed off on the traveler, attached is a copy of the test and a schematic. And Ray Ceruti has the traveler. Enjoy your vacation. Sonny
From: Kin Yip [mailto:kinyip AT bnl.gov]
Hi,
All,
We have made significant progress and hope to do a pressure test next week once we get control of the valves. The majority of the mechanical tasks have been completed. We had one technician working into his lunch today. I left the platform at 12pm and he was still there. Electrical tasks are progressing well also. At this point, we should be ready for a safety walk through on the 17th. Thank you, Paul Orfin
|
-
[Sphenix-magnet-l] electrical/hypot tests are done --- voltage taps connected to the resistor board,
Kin Yip, 11/07/2017
- Re: [Sphenix-magnet-l] electrical/hypot tests are done --- voltage taps connected to the resistor board, Yip, Kin, 11/07/2017