[Sphenix-magnet-l] electrical/hypot tests are done --- voltage taps connected to the resistor board
- From: Kin Yip <kinyip AT bnl.gov>
- To: "sphenix-magnet-l AT lists.bnl.gov" <sphenix-magnet-l AT lists.bnl.gov>
- Subject: [Sphenix-magnet-l] electrical/hypot tests are done --- voltage taps connected to the resistor board
- Date: Tue, 7 Nov 2017 14:28:15 -0500
Hi, Sonny has just informed us (with the documents) that he's finished electrical and hypot test. ( In the past, he's measured 0.1-2 micro-amp during hypot; but today is a particularly good day, he's got 0.0 micro-amp. ) He's also connected the voltage taps down/up to the resistor board in his half-rack on the lower platform. So, now Ray Ceruti is only waiting for Richard Meier and Paul Giannotti/F. Toldo to finish and check the connections inside the doghouse before he closes it. Kin -------- Forwarded Message -------- Subject: RE: Electrical Tests Date: Tue, 7 Nov 2017 14:12:32 -0500 From: Dimaiuta, Sebastian A <sonny AT bnl.gov> To: Yip, Kin <kinyip AT bnl.gov> Hi Kin Tests are done Piyush signed off on the traveler, attached is a copy of the test and a schematic. And Ray Ceruti has the traveler. Enjoy your vacation. Sonny
From:
Kin Yip [mailto:kinyip AT bnl.gov]
Hi,
RE: working to make the deadline ? Date:Fri, 3 Nov 2017 13:12:55 -0400 From:Orfin, Paul <porfin AT bnl.gov> To:Yip, Kin <kinyip AT bnl.gov>, Than, Yatming (Roberto) <ythan AT bnl.gov> CC:Mills, James A <mills AT bnl.gov>
All,
We have made significant progress and hope to do a pressure test next week once we get control of the valves. The majority of the mechanical tasks have been completed. We had one technician working into his lunch today. I left the platform at 12pm and he was still there. Electrical tasks are progressing well also. At this point, we should be ready for a safety walk through on the 17th.
Thank you,
Paul Orfin
Cryogenic Systems, Collider-Accelerator Department Brookhaven National Laboratory Telephone: (631) 344-2899
|
Attachment:
S-Pheonix elec check Final 11-7-17.xlsx
Description: application/vnd.openxmlformats-officedocument.spreadsheetml.sheet
Attachment:
SPheonix VT layout.vsd
Description: application/vnd.visio
- [Sphenix-magnet-l] electrical/hypot tests are done --- voltage taps connected to the resistor board, Kin Yip, 11/07/2017
Archive powered by MHonArc 2.6.24.