Skip to Content.
Sympa Menu

sphenix-magnet-l - Re: [Sphenix-magnet-l] Time for restraint adjustment ... but do we need to install Heat Shield restraint (just to move Magnet out of the Steel box) ?

sphenix-magnet-l AT lists.bnl.gov

Subject: sPHENIX discussion of the superconducting solenoid

List archive

Chronological Thread  
  • From: "Yip, Kin" <kinyip AT bnl.gov>
  • To: "Anerella, Michael D" <mda AT bnl.gov>
  • Cc: "sphenix-magnet-l AT lists.bnl.gov" <sphenix-magnet-l AT lists.bnl.gov>
  • Subject: Re: [Sphenix-magnet-l] Time for restraint adjustment ... but do we need to install Heat Shield restraint (just to move Magnet out of the Steel box) ?
  • Date: Wed, 23 Oct 2019 14:52:43 +0000

Hi,

So the conclusion is that we need those heat shield restraints.  After a couple trials, I found Mike Lenz in his office in Bldg. 510.  He helped me load the restraints plus the 6 bars into my car.

Now, I am waiting at 912 for Ray Ceruti who said that he would show up at any minute now.

For the new one, we have those 3 pairs of simple bars (i.e. 6 in total, made by Mike) but for the old ones, we don't 😑.  I will talk with Ray about this ...


Kin


-------- Original message --------
From: "Anerella, Michael D" <mda AT bnl.gov>
Date: 10/23/19 10:04 (GMT-05:00)
To: "Yip, Kin" <kinyip AT bnl.gov>
Cc: "Phillips, David B" <phillips AT bnl.gov>, "Mills, James A" <mills AT bnl.gov>, "Ceruti, Raymond B" <rayc AT bnl.gov>
Subject: Re: Time for restraint adjustment ... but do we need to install Heat Shield restraint (just to move Magnet out of the Steel box) ?

Kin,
Tightening the tie rods secures the coil not the heat shield. I have asked Ray to implement both. 
Mike



On Oct 23, 2019, at 9:17 AM, Yip, Kin <kinyip AT bnl.gov> wrote:

Hello Mike,

 

There may be a language / terminology problem of mine.

 

Ray Ceruti just typed :

 

>     We are going down this morning to tighten the heat shield restraint adjustments (3 turns) as well as the axial adjustment (3 Âź turns) just like what was done to move the solenoid into its current position.  The separate Heat shield end restraints were not used at that time, they were only in place for the original shipment to BNL.

 

When you guys talked about “heat shield restraint, I immediately thought about the 3 that we lost and then asked Mike Lenz made, as the picture attached.  ( Now we have 6 in total. )

 

From Ray’s message, without those external restraints (in the picture), Ray can rotate to tighten the heat shield restraint.   This is certainly fine with me/us.

 

But Ray implied that we don’t need those 6 “external” heat shield restraints now.   They’re needed only when we do the shipment from 912 to 1008 ??

 

Am I right ???

 

Yours “confusingly”,

 

Kin

 

 

From: Anerella, Michael D <mda AT bnl.gov>
Sent: Wednesday, October 23, 2019 8:41 AM
To: Yip, Kin <kinyip AT bnl.gov>
Cc: Phillips, David B <phillips AT bnl.gov>; Mills, James A <mills AT bnl.gov>
Subject: RE: Time for restraint adjustment ... but do we need to install Heat Shield restraint (just to move Magnet out of the Steel box) ?

 

Dearest Kin,

I believe I have said several times already that we recommend implementing all restraints to magnet and valve box in advance of any rigging.  For the magnet this includes heat shield restraints and coil tie rods. 

I hope this helps.

Thank you.

Warm Regards,

Mike

 

 

Michael D. Anerella, P.E.

Chief Mechanical Engineer

Superconducting Magnet Division

Brookhaven National Laboratory

17 Cornell Avenue

Building 902A

Upton, NY 11973

631-344-7291

mda AT bnl.gov

 

From: Yip, Kin <kinyip AT bnl.gov>
Sent: Tuesday, October 22, 2019 10:28 PM
To: Anerella, Michael D <mda AT bnl.gov>
Cc: Phillips, David B <phillips AT bnl.gov>; Mills, James A <mills AT bnl.gov>
Subject: RE: Time for restraint adjustment ... but do we need to install Heat Shield restraint (just to move Magnet out of the Steel box) ?

 

Dear Mike,

 

Can you please let us know as soon as possible whether that “heat shield restraint” is needed at all for just

moving the Magnet from the Steel Box to the floor in 912 ??

 

Kin

 

From: Yip, Kin <kinyip AT bnl.gov>
Sent: Monday, October 21, 2019 5:05 PM
To: Anerella, Michael D <mda AT bnl.gov>; sphenix-magnet-l AT lists.bnl.gov
Subject: Time for restraint adjustment ... but do we need to install Heat Shield restraint (just to move Magnet out of the Steel box) ?

 

Dear Mike,

Dave Phillips (who have come back) and I were just discussing about asking Ray Ceruti to do the restraint adjustment (~3 turns)
as described in your traveller :
https://collab.external.bnl.gov/sites/sPHENIX-Magnet/Shared%20Documents/2019-9-26%20SMD%20Traveller%20for%20restraint%20adjustment.pdf

Because we're close to asking the riggers move the Magnet out of the Steel box (in Bldg. 912)  to the floor of Bldg. 912, a few meters away.

But Dave asked me whether we need to apply the "Heat Shield Restraints" (as shown below on the left of your picture below).  I told him
that we have to check with Mike :-)

Can you please let us know whether we need to install the heat shield restraints just to move the Magnet out of the Steel box to the floor ?

Kin

 

<image001.jpg>

 

Michael D. Anerella, P.E.

Chief Mechanical Engineer

Superconducting Magnet Division

Brookhaven National Laboratory

17 Cornell Avenue

Building 902A

Upton, NY 11973

631-344-7291

mda AT bnl.gov

 

From: Yip, Kin <kinyip AT bnl.gov>
Sent: Tuesday, October 01, 2019 10:34 AM
To: Than, Yatming (Roberto) <ythan AT bnl.gov>; Anerella, Michael D <mda AT bnl.gov>; Schultheiss, Carl <carls AT bnl.gov>; Haggerty, John <haggerty AT bnl.gov>; Orfin, Paul <porfin AT bnl.gov>
Subject: Re: Practice this week Oct 2-3, for the sPHENIX I&F review

 

Hi,

Well, that's one of them.  The other one is the risk in transporting it from 912 to 1008 if we drop it ! :-)

I asked Irina to add it and she added it after asking about the worst scenario (which is not used in her simulation)  and the cost to replace the magnet etc.
I mentioned it in a L2 Manager meeting :

https://indico.bnl.gov/event/6607/contributions/30426/attachments/24082/35349/2019-8-8_L2_Managers_Meeting.pptx

Kin

On 10/1/19 10:24 AM, Than, Yatming (Roberto) wrote:

 

The action was to officially record the risk into the project resulting from the 912 cold test, that the solenoid did not stay at full current for more than 24 hours but only a few hours, i.e. stability test not really completed.

 

From: Yip, Kin <kinyip AT bnl.gov>
Sent: Tuesday, October 01, 2019 10:16 AM
To: Than, Yatming (Roberto) <ythan AT bnl.gov>; Anerella, Michael D <mda AT bnl.gov>; Schultheiss, Carl <carls AT bnl.gov>; Haggerty, John <haggerty AT bnl.gov>; Orfin, Paul <porfin AT bnl.gov>
Subject: Re: Practice this week Oct 2-3, for the sPHENIX I&F review

 

Hi,

There is the close-out document in the Director's Review page :

https://indico.bnl.gov/event/5961/attachments/22264/30966/DOE_CD1-3A_1805_sPHENIX_Closeout_Rpt.pdf

which doesn't mention much about the Magnet.   If you don't remember anything, it's probably not much ...

I only remember that they complained about us not acknowledging the very unlikely but significant risks.

Kin

On 10/1/19 10:05 AM, Than, Yatming (Roberto) wrote:

Did we have any recommendations from the April review we were supposed to address?

Roberto

 

From: Yip, Kin <kinyip AT bnl.gov>
Sent: Tuesday, October 01, 2019 9:30 AM
To: Than, Yatming (Roberto) <ythan AT bnl.gov>; Anerella, Michael D <mda AT bnl.gov>; Schultheiss, Carl <carls AT bnl.gov>; Haggerty, John <haggerty AT bnl.gov>; Orfin, Paul <porfin AT bnl.gov>
Subject: Re: Practice this week Oct 2-3, for the sPHENIX I&F review

 

I am modifying my talk today/now ...

On 10/1/19 8:49 AM, Than, Yatming (Roberto) wrote:

I did put the presentation together yet.

Have to work on it today.

Roberto

Roberto

 


From: Yip, Kin <kinyip AT bnl.gov>
Sent: Tuesday, October 1, 2019 8:46:19 AM
To: Anerella, Michael D <mda AT bnl.gov>; Schultheiss, Carl <carls AT bnl.gov>; Than, Yatming (Roberto) <ythan AT bnl.gov>; Haggerty, John <haggerty AT bnl.gov>
Subject: FW: Practice this week Oct 2-3, for the sPHENIX I&F review

 

Hello,

 

I believe that you received the email below asking you to practice your talk tomorrow (Oct. 2, 2019 !!).

 

Just in case you couldn’t find your talk in April’s Director’s Review, you may find it here :

 

https://indico.bnl.gov/event/5961/

 

Kin

 

From: O'Brien, Edward <eobrien AT bnl.gov>
Sent: Monday, September 30, 2019 6:01 PM
To: O'Brien, Edward <eobrien AT bnl.gov>; Glenn Young <glennyoung82251 AT gmail.com>; Lavelle, Cathleen B <lavellec AT bnl.gov>; Haggerty, John <haggerty AT bnl.gov>; Mills, James A <mills AT bnl.gov>; Feder, Russell <rfeder AT bnl.gov>; Sourikova,Irina V <irina AT bnl.gov>; Gutta, Rajendra Rao <rgutta AT bnl.gov>; Tom Hemmick <tkhemmick AT gmail.com>; Woody, Craig <woody AT bnl.gov>; Lajoie, John G <lajoie AT iastate.edu>; Mannel, Eric <mannel AT bnl.gov>; Chiu, Mickey <chiu AT rcf.rhic.bnl.gov>; Purschke, Martin <purschke AT bnl.gov>; Frawley, Anthony <afrawley AT fsu.edu>; Sickles, Anne M <sickles AT illinois.edu>; Caroline Riedl <criedl AT illinois.edu>; Phillips, David B <phillips AT bnl.gov>; Streckenbach, Brian <bstreckenbach AT bnl.gov>; Yip, Kin <kinyip AT bnl.gov>; Cheng-Yi Chi <chi AT nevis.columbia.edu>; Akiba, Yasuyuki <akiba AT bnl.gov>; Liu, Ming <ming AT bnl.gov>; Nouicer, Rachid <nouicer AT bnl.gov>; Nakagawa, Itaru <itaru AT bnl.gov>; Huang, Jin <jhuang AT bnl.gov>; klaus Dehmelt <klaus.dehmelt AT stonybrook.edu>; Boose, Stephen <boose AT bnl.gov>; Stoll, Sean <stoll AT bnl.gov>; Pisani, Robert <pisani AT bnl.gov>; Senta Greene <senta.v.greene AT vanderbilt.edu>; Sasha Milov <alexander.milov AT weizmann.ac.il>; Aidala, Christine <caidala AT bnl.gov>; David Lee <dlee AT lanl.gov>; Desmond, Edmond <desmond2 AT bnl.gov>; Ruggiero, Richard <ruggiero AT bnl.gov>; Azmoun, Babak <azmoun AT bnl.gov>; Sakaguchi, Takao <takao AT bnl.gov>; Mastronardi, Emily <emastronardi AT bnl.gov>; Bernath, Philip <pbernath AT bnl.gov>; Jamie Nagle <jamie.nagle AT colorado.edu>; Dennis Perepelitsa <Dennis.Perepelitsa AT colorado.edu>; Pontieri, Chris <cpontieri AT bnl.gov>; Megan Connors <meganeconnors AT gmail.com>; Anerella, Michael D <mda AT bnl.gov>; Than, Yatming (Roberto) <ythan AT bnl.gov>; Schultheiss, Carl <carls AT bnl.gov>; Bathe, Stefan <bathe AT bnl.gov>; Stiegler, Lori <stiegler AT bnl.gov>; Franz, Achim <afranz AT bnl.gov>; Gortakowski, Charles <cgortakowski AT bnl.gov>; W J Llope <wjllope AT wayne.edu>; Grazyna Odyniec <g_odyniec AT lbl.gov>; Ross Corliss <rcorliss AT mit.edu>; Cacace, Daniel <dcacace AT bnl.gov>; Miraval, Connor <cmiraval AT bnl.gov>; Megan Elizabeth Connors <mconnors AT gsu.edu>
Subject: Practice this week Oct 2-3, for the sPHENIX I&F review

 

    Hi all,
     We will hold a practice this week, Wednesday and Thurs Oct 2-3
    for the sPHENIX Infrastructure and Facility Upgrade review
    which will be held at BNL Oct 16-17.
     The Indico link for the practice is:
   https://indico.bnl.gov/event/6879/

     The practice will be in room 2-219 of the BNL Physics Building.
    Please use the attached talk template for your presentations.
    The talk organization is very similar to that used in the April
     Director's review. If appropriate one can have multiple
    Technical Overview, Scope and Status & Highlights slides in
    your talks. The ES&H and QA talks should be very similar to
    those from the April review.

    The Bluejeans connection will be:   
    Meeting ID:991617325
    Meeting URL:https://bluejeans.com/991617325

    To join via phone :
    1) Dial: +1.408.740.7256
    +1.888.240.2560
    +1.408.317.9253 (see all numbers - http://bluejeans.com/numbers?ll=en)

    We would like to practice all of the talks Oct 2 &3 but realize that we will
    have to be flexible with the talk schedule. Let us know if the time shown
    on the Indico schedule has to change. Please let me know if you have
    any questions. Thanks.

    Ed


    

   

 

 

 

 

<IMG_2762.JPG>



Archive powered by MHonArc 2.6.24.

Top of Page