- From: "Yip, Kin" <kinyip AT bnl.gov>
- To: "sphenix-magnet-l AT lists.bnl.gov" <sphenix-magnet-l AT lists.bnl.gov>
- Cc: "Michnoff, Robert J" <michnoff AT bnl.gov>
- Subject: [Sphenix-magnet-l] good progress this morning ...
- Date: Thu, 20 Oct 2022 14:18:30 +0000
Hi,
I noticed that Tim and Chris came in to work on 1008B mezzanine at 7 am … as I called, though they had monitor problem for a bit 😊
First of all, they told me that they had solved the “ground fault reset” problem last evening. When I visited them, they wanted to ask for help from Ralph Schoenfeld’s group. I found Ralph and he sent Peter Zimmerman to 1008B to help.
Long story short, as John Morris’ hunch, the two cables for the two PSI modules (one for driving the setpoint and the other for readback) were swapped by mistake. After swapping back, we started to get readings. Pablo adjusted some reference …
I left 1008B mezzanine when Pablo and his colleagues were taking a break. They’ll connect the pole-tip door interlock signals and then test everything (with the pet page ramp) together again.
When I asked Pablo whether he could sign off on the check-off list after that, he said “he’d think about it” 😊
Meanwhile :
Kin |