Hi Ming,
You are bringing up an important issue. We would have to identify
the space at BNL to do this kind of rework. My best knowledge is that
there aren't any unoccupied clean rooms at BNL. If we think that
we might need one for the MVTX we need to do a little planning
ahead of time. Thanks.
Ed
On 4/23/21 4:53 PM, Liu, Ming Xiong wrote:
Hi Grazyna, Camelia, Yuan, Jo and all,
One topic that I didn’t get time to bring up for discussion at today's
meeting, and like to ask you all to think about:
- what if we need to re-work on the assembled detector at BNL? Will we be
ready?
From ALICE experience (see the following email), ITS has to rework on the
detector assembly several times during the surface commissioning and also at
installation.
Well they have labs at CERN so it was not a big challenge, it could be
different for MVTX.
My concern is that whether we can do the similar work at BNL - open up the
detector and replaced faulty components, could be cables or sensors etc.
Our current plan is to ship the fully tested MVTX half-detectors to BNL early
2022, and we will have several months of time doing pre-installation
commissioning, and hope nothing bad happens to the MVTX detectors. BUT, we
need to be prepared for the worst, so my question is:
- should we also ship all the assembly fixtures to BNL and setup a
clean tent so that we can rework on the half-detectors if needed? Or we send
the detector back to LBNL to fix?
- do the current assembly fixtures and procedure allow us to do such
operation at BNL?
Cheers,
Ming
-----
Dr. Ming Xiong Liu
P-3, MS H846
Physics Division
Office: 505.667.7125
Mobile: 505.412.7396
Los Alamos National Laboratory
lanl.gov
<https://urldefense.com/v3/__https://www.instagram.com/losalamosnatlab/__;!!P4SdNyxKAPE!SpuK63MdUiHySh3YRBDc8t5WFCK-NoAaRzR1LzQ8fRoOir-Z0eR1IlIevrEmakqfLy6nAhNwEZQ$ > <https://urldefense.com/v3/__https://twitter.com/LosAlamosNatLab__;!!P4SdNyxKAPE!SpuK63MdUiHySh3YRBDc8t5WFCK-NoAaRzR1LzQ8fRoOir-Z0eR1IlIevrEmakqfLy6nBjDlEXM$ > <https://urldefense.com/v3/__https://www.linkedin.com/company/los-alamos-national-laboratory/__;!!P4SdNyxKAPE!SpuK63MdUiHySh3YRBDc8t5WFCK-NoAaRzR1LzQ8fRoOir-Z0eR1IlIevrEmakqfLy6nO_p7X7A$ > <https://urldefense.com/v3/__https://www.facebook.com/LosAlamosNationalLab/__;!!P4SdNyxKAPE!SpuK63MdUiHySh3YRBDc8t5WFCK-NoAaRzR1LzQ8fRoOir-Z0eR1IlIevrEmakqfLy6n34MjMiI$ >
-
[Sphenix-maps-l] MVTX commissioning plan .... Possible rework on detector at BNL,
Liu, Ming Xiong, 04/23/2021
-
Re: [Sphenix-maps-l] MVTX commissioning plan .... Possible rework on detector at BNL,
Edward O'Brien, 04/27/2021
-
Re: [Sphenix-maps-l] MVTX commissioning plan .... Possible rework on detector at BNL,
Grazyna Odyniec, 04/27/2021
- Re: [Sphenix-maps-l] MVTX commissioning plan .... Possible rework on detector at BNL, Ming Liu, 04/27/2021
-
Re: [Sphenix-maps-l] MVTX commissioning plan .... Possible rework on detector at BNL,
Grazyna Odyniec, 04/27/2021
-
Re: [Sphenix-maps-l] MVTX commissioning plan .... Possible rework on detector at BNL,
Edward O'Brien, 04/27/2021
Archive powered by MHonArc 2.6.24.