Minutes shift change 2023-04-29
evening: Genki
- no problems
- INTT work
- remote HCal work (Hanpu)
night: David
- no problems
- some more ongoing remote work
day: Zhaozhong
- at 8:45am TPC NE cooling was forced tripped by accidental click ,
immediately turned back on
- IR exhaust fan came on multiple times, called MCR, false alarm? —> follow
up with Lee on Monday
- 11:00am alarm for water leak at labyrinth entrance: not audible!! —>
follow up with Lee and Joel
- entered AH, found water near entrance, traced back to chiller platform B
- got in touch with Peter, Peter instructed to turn off TPC LV and close
valves for both supply and return, which stopped leak
- Cameron and Frank came in, fixed pipe connection (loose hose clamp)
- in the process chiller was switched off, Cameron did drain as display
suggested, but it turns out this is not advised
- all fixed now, Rob confirmed that it is save to turn TPC LV back on
- still drying out area with pads
- Cameron finished cabling work for Joel
MBD (Mickey)
- nothing interesting
HCal (Hanpu)
- yesterday evening lots of problems trying to take cosmics
- every try there was a high chance to to crash seb17 or 16 or rc_control,
needed to recover every few minutes, got got 2 h of cosmics out of 5 h or
work! —> follow up with Martin
- today Emma saw message "seb16 2W2 rack trigger not functioning”
- this is the same problem as a few days ago, which was solved by swapping
out crate controller -> follow up with Martin, Dan Lis
- event number stuck, no blue light in TP fan out board, suggests GTM problem
—> follow up with Martin
EMCal
- no report
TPOT (Hugo by email)
- took noise data yesterday and Thursday with the pole tip doors closed. No
increase in noise was observed.
TPC (Jin)
- heroic effort from 1008 crew to fix the TPC ECW leak on the Chiller
Platform B
- status summarized in an interactive snapshot on the TPC FEE status:
https://urldefense.com/v3/__https://snapshots.raintank.io/dashboard/snapshot/dfBFK6d7Lx9tsytp1NkgmSDuH1kAmsLR__;!!P4SdNyxKAPE!GbdO0crxL87I9mk4rZKf8n60abu_IsZYrEIfnRKdnM8_pvyUuxO1kyVxx9-sW3MnT3KGyuoh4Sf6Bmfya06Ve7127ead7_QDgk_eSUYi$
• Takao got 622 out of 624 TPC FEEs to link and readout telemetry around
end of Friday
• Most links have been stable since then other than few transient
instability
• Around 9AM, north LV was accidentally cycled which lead to quite a few
link loss : https://sphenix-intra.sdcc.bnl.gov/WWW/elog/Run+2023+Log/438
• All FEEs off since noon with the ECW fix :
https://sphenix-intra.sdcc.bnl.gov/WWW/elog/Run+2023+Log/442
Note to shift crew is any cooling or LV operation (including of the 9AM
quick reset) should make an entry in the TPC Elog. (And not for now and only
later during serious operation, any cooling or LV interruption need
call TPC expert on shift to properly recover electronics)
INTT (Genki)
- LV GUI will be updated for shift crew
- this evening Raul will do work
- tomorrow will do noise data measurement
MVTX (Zhaozhong)
- yesterday ECW connected to chiller for daq system
- managed to read out data for felix 4 and felix 5, got prdf file, were able
to decode
sEPD
- no report
DAQ
- no report
Magnet (from elog)
- Martin did work on GTM
Plan of the day
- DAQ development
- subsystem testing
-
---------------------------------------------------------------------------------
Stefan Bathe
Professor of Physics
Baruch College, CUNY
and RIKEN Visiting Scientist
Baruch: BNL:
17 Lexington Ave Bldg. 510
office 940 office 2-229
phone 646-660-6272 phone 631-344-8490
----------------------------------------------------------------------------------
- [Sphenix-run-l] Minutes shift change 2023-04-29, Stefan Bathe, 04/29/2023
Archive powered by MHonArc 2.6.24.