Skip to Content.
Sympa Menu

sphenix-run-l - [Sphenix-run-l] shutdown three rack in rack room at 4:00pm

sphenix-run-l AT lists.bnl.gov

Subject: Commissioning and running of sPHENIX

List archive

Chronological Thread  
  • From: Stefan Bathe <stefan.bathe AT baruch.cuny.edu>
  • To: sphenix-run-l AT lists.bnl.gov
  • Subject: [Sphenix-run-l] shutdown three rack in rack room at 4:00pm
  • Date: Thu, 4 May 2023 15:18:57 -0400

Hi,

In order to change connectors in the power distribution box (IRR fall-out), we plan to temporarily shut down power to the following three racks in the rack room today at 4:00pm:

3.2.  spare GTM
4.1:  fiber patch panel
4.2:  DCM2

Best,
Stefan

IMG_0528.jpegIMG_0529.jpegIMG_0530.jpeg

---------------------------------------------------------------------------------
Stefan Bathe
Professor of Physics
Baruch College, CUNY
and RIKEN Visiting Scientist

Baruch:                                     BNL:
17 Lexington Ave                      Bldg. 510
office 940                                  office 2-229
phone 646-660-6272                phone 631-344-8490
----------------------------------------------------------------------------------





  • [Sphenix-run-l] shutdown three rack in rack room at 4:00pm, Stefan Bathe, 05/04/2023

Archive powered by MHonArc 2.6.24.

Top of Page