Minutes shift change 2023-05-16

general
—————
approval
- Mike Clancy approved
- as of yesterday evening on BHSO’s desk
- Kin: BHSO asked for OPC for sweep, satisfied

- Kin: Nitrogen dewar: non-insulating valve: cryo group working on fixing
it
- Kin: use only BNL tags

access:
- STAR repair finished early, MCR just asked for sweep at sPHENIX
- tomorrow 8am - 6pm—but sweep sPHENIX earlier

evening (Raghav)
- smooth
- testing beam
- losing yellow a few times

night (Brett)
- leak behind INTT chiller -> Rachid: fixed flow meter
- HCal trip

Day (Ben)
- MCR access IR for sweep training
- 1:30pm. all of TPC rack mysteriously turned off—>talked to Lee
- reason unclear
- experts turned racks back on
—> follow up with Joel
- whole panel

MBD (Abdul)
- modified HV GUI
- uploaded HV GUI to DO station
- access to fix some FEM couple

HCAL (Virginia)
- yesterday morning 9 HV channels tripped
- this morning 3 of those tripped again
- reason unclear

EMCal (Sean)
- essentially entire detector functioning
- DAQ development with Martin

TPOT (Hugo)
- nothing except for rack

TPC (Takao)
- investigating additional noise in particular sectors
- measures impedance: that’s not it
- unplugged cables at power supply: no difference w/ and w/o connection
- can live with noise, just have to adjust threshold

INTT (Rachid)
- replaced flow meter in chiller (fixed leak)
- turned on bias and LV
- Raul, Itaru, Genki working to move INTT to big partition
- Joseph working on online monitoring based on
- INTT LV off
- turn INTT LV and bias off if beam injected

MVTX (Jo)
- working on configuration of CAEN system
- breaker was installed yesterday, functional
- Yasser: seeing algae in stave cooling water accumulating on top of flow
meter, investigating
—> analyze
- Martin: CAEN-bus module: update firmware

sEPD nothing

DAQ (Martin)
- reading out GL1
- added INTT
- tomorrow will add EMCal

Trigger (Dan)
- plug in for LL1 completed, decoder is as well
- MBD trigger ready
- calorimeter trigger under development

ZDC (John)
- saw collisions, hmm
- need SEB machine: Marting



-
---------------------------------------------------------------------------------
Stefan Bathe
Professor of Physics
Baruch College, CUNY
and RIKEN Visiting Scientist

Baruch: BNL:
17 Lexington Ave Bldg. 510
office 940 office 2-229
phone 646-660-6272 phone 631-344-8490
----------------------------------------------------------------------------------




  • [Sphenix-run-l] Minutes shift change 2023-05-16, Stefan Bathe, 05/16/2023

Archive powered by MHonArc 2.6.24.

Top of Page