  • Subject: [Sphenix-run-l] notes form 9 o'clock meeting (5/19)
  • Date: Fri, 19 May 2023 12:21:44 -0400

RHIC
- rebucketing is done
- fixed collimation issue (yellow still not as clean as blue)
- one store lost on bpm permit
- false alarm, controlled beam dump, no risk for sPHENIX
- limited to 10^9 intensity, investigating
STAR
- beautifully centered
- next 1 mead
- used data for calibration
- probably ready to go to physics over weekend
debunched beam until stochastic cooling is in effect
sPHENIX
- approval to operate granted yesterday
- access underway for:
- starting magnet cryo
- starting nitrogen flow
- starting operating gas for TPOT and TPC
- instrumenting North tunnel background scintillators
- MBD saw lots of junk from north in first store
- difficulty timing in MBD since RHIC tune changed and coarse delay in GL1
(called L1 delay) was not implemented yet
- miscommunication between shift crews and experts: experts didn’t get
called for overnight store
- plan for tonight: continue MBD trigger commissioning
RHIC plan:
- run beam for experiments starting after this morning’s access through the
weekend
- start with 56 bunches

(see Travis’s slides and my slide attached)

PNG image






PNG image

PNG image


-
---------------------------------------------------------------------------------
Stefan Bathe
Professor of Physics
Baruch College, CUNY
and RIKEN Visiting Scientist

Baruch: BNL:
17 Lexington Ave Bldg. 510
office 940 office 2-229
phone 646-660-6272 phone 631-344-8490
----------------------------------------------------------------------------------