RHIC
-------
PS board swap didn’t work
decided to swap power supply
also injection kicker
then booster main magnet dropped out at 5:30pm
repair until 2:30am
injection kicker didn’t hold magnet
sextuple repair worked
APEX got started early
still no blue injection kicker
working behind APEX
- needs blue ring for part of the program

STAR
————
no update

sPHENIX (see slides)
——————
- analyzed data from Tuesday morning
- first EMCal HCal correlations
- first pi0 peak


---------------------------------------------------------------------------------
Stefan Bathe
Professor of Physics
Baruch College, CUNY
and RIKEN Visiting Scientist

Baruch:                                     BNL:
17 Lexington Ave                      Bldg. 510
office 940                                  office 2-229
phone 646-660-6272                phone 631-344-8490
----------------------------------------------------------------------------------






---------------------------------------------------------------------------------
Stefan Bathe
Professor of Physics
Baruch College, CUNY
and RIKEN Visiting Scientist

Baruch:                                     BNL:
17 Lexington Ave                      Bldg. 510
office 940                                  office 2-229
phone 646-660-6272                phone 631-344-8490
----------------------------------------------------------------------------------





  • [Sphenix-run-l] Notes from the 9 o'clock meeting, 5/24, Stefan Bathe, 05/24/2023

Archive powered by MHonArc 2.6.24.

Top of Page