[Sphenix-run-l] notes form 9 o'clock meeting (5/26)
- From: Stefan Bathe <stefan.bathe AT baruch.cuny.edu>
- To: sphenix-run-l AT lists.bnl.gov
- Subject: [Sphenix-run-l] notes form 9 o'clock meeting (5/26)
- Date: Fri, 26 May 2023 10:43:50 -0400
RHIC (see attached link)
- Issue with blue landau rf cavity - prevents instabilities during ramp (then off)
- can’t do 111 without
- need more 56x56 bunch stores to set up machine
10:30am update
RF is in the ring for the blue landau, MCR has the start of store automatic steering working.
Next ramp we will try another 56 ramp with the landaus on. The stochastic system expert is not available today to set up so we will stick to stores that don't go above 10e9 (about 3 hours). If he is available this weekend at some point MCR will contact him and we can reevaluate store length.
STAR
- no update
sPHENIX (see slide link)
- first TPOT HV on data with beam
- INTT timing scans
- TPC HV to half field with beam
-
---------------------------------------------------------------------------------
Stefan Bathe
Stefan Bathe
Professor of Physics
Baruch College, CUNY
and RIKEN Visiting Scientist
Baruch: BNL:
17 Lexington Ave Bldg. 510
office 940 office 2-229
phone 646-660-6272 phone 631-344-8490
----------------------------------------------------------------------------------
Baruch College, CUNY
and RIKEN Visiting Scientist
Baruch: BNL:
17 Lexington Ave Bldg. 510
office 940 office 2-229
phone 646-660-6272 phone 631-344-8490
----------------------------------------------------------------------------------
- [Sphenix-run-l] notes form 9 o'clock meeting (5/26), Stefan Bathe, 05/26/2023
Archive powered by MHonArc 2.6.24.