Skip to Content.
Sympa Menu

sphenix-run-l - [Sphenix-run-l] TPC Running Status - Leaving HV + LV on overnight 03/10 - 03/11 and taking data

sphenix-run-l AT lists.bnl.gov

Subject: Commissioning and running of sPHENIX

List archive

Chronological Thread  
  • From: "Hughes, Charles [PHYSA]" <chughes2 AT IASTATE.EDU>
  • To: "sphenix-run-l AT lists.bnl.gov" <sphenix-run-l AT lists.bnl.gov>
  • Subject: [Sphenix-run-l] TPC Running Status - Leaving HV + LV on overnight 03/10 - 03/11 and taking data
  • Date: Sun, 10 Mar 2024 23:38:17 +0000

Hello sphenix-run-l,

I am informing everyone that the TPC HV + LV will remain on tonight 03/10 into early tomorrow morning 03/11. We have favorable humidity conditions which provide us with at least a 9-10 deg. C safety margin in the bore/IR with respect to the dewpoint temperatures there. We also observe an exceptionally stable HV system which at time of writing has not tripped once in 3 hours of operating.

The shift crew will continue to take data for us with the HCAL horizontal cosmic coincident trigger which is currently being used. We have instructed them to start runs every 20 minutes which at the current trigger rate (17-18 Hz) gives ~ 20K events/run. Additionally, if trips do occur, they have been instructed to just leave the trips to be recovered by experts (our fast and slow protection is running). Experts will be on call if something goes wrong.

In the morning, it was agreed that Tom will lower the HV BEFORE the scheduled MVTX/INTT bore works takes place. He will attend the 830 AM meeting virtually to coordinate this as well as coordinate this with the shift crew when he does it.

Just letting everyone know, feel free to ask questions.

Thanks






  • [Sphenix-run-l] TPC Running Status - Leaving HV + LV on overnight 03/10 - 03/11 and taking data, Hughes, Charles [PHYSA], 03/10/2024

Archive powered by MHonArc 2.6.24.

Top of Page