sphenix-sepd-l AT lists.bnl.gov
Subject: sPHENIX Event Plane Detector discussion
List archive
Re: [sphenix-sepd-l] sEPD handle/"Bike rack" schedules
- From: "Pontieri, Chris" <cpontieri AT bnl.gov>
- To: "Ruggiero, Richard" <ruggiero AT bnl.gov>, Rosi Reed <rosijreed AT lehigh.edu>, "Feder, Russell" <rfeder AT bnl.gov>, "sphenix-sepd-l AT lists.bnl.gov" <sphenix-sepd-l AT lists.bnl.gov>
- Subject: Re: [sphenix-sepd-l] sEPD handle/"Bike rack" schedules
- Date: Tue, 21 Mar 2023 19:32:00 +0000
Carter has the hardware in hand, and will start laying out the holes this week.
Best Regards,
Christopher Pontieri
From: Ruggiero, Richard
Hi Rosi, The handles need to be attached before the petals are attached. I spoke with Carter today and he has the drawing for the handle locations. Frank Toldo ordered the handles and associated hardware. He has them in 1008. I also asked Chris Pontieri (cc’d) if he could get those parts to Carter.
Attached are all the related drawings.
Rich
From: Rosi Reed <rosijreed AT lehigh.edu>
Hi Russ/Rich, We wanted to check on the time scales for the handle for the sEPD strongback and the "bike rack". Other than our test fits with a single strongback petal, it doesn't make sense to assemble the strongback pieces until the holes are drilled into the petals and the "bike racks" exist. We also will need to unassemble the one we have for the holes to be drilled. It sounds like these activities are planned from talking to our sEPD crew, can you let us know what the timing is? Rich - can you send around the final drawings for the handle? One thing I did not know is whether there was a washer or anything that needed to go under the scintillator for this design. Basically, there is the question if whether the handles can be added after the petal assembly or whether this is something that needed to happen prior to the entire assembly. Regards, Rosi
Rosi Reed |
-
[sphenix-sepd-l] sEPD handle/"Bike rack" schedules,
Rosi Reed, 03/21/2023
-
Re: [sphenix-sepd-l] sEPD handle/"Bike rack" schedules,
Ruggiero, Richard, 03/21/2023
-
Re: [sphenix-sepd-l] sEPD handle/"Bike rack" schedules,
Pontieri, Chris, 03/21/2023
-
Re: [sphenix-sepd-l] sEPD handle/"Bike rack" schedules,
Pontieri, Chris, 03/21/2023
- Re: [sphenix-sepd-l] sEPD handle/"Bike rack" schedules, Rosi Reed, 03/22/2023
-
Re: [sphenix-sepd-l] sEPD handle/"Bike rack" schedules,
Pontieri, Chris, 03/21/2023
-
Re: [sphenix-sepd-l] sEPD handle/"Bike rack" schedules,
Pontieri, Chris, 03/21/2023
-
Re: [sphenix-sepd-l] sEPD handle/"Bike rack" schedules,
Ruggiero, Richard, 03/21/2023
Archive powered by MHonArc 2.6.24.