sphenix-sepd-l - Re: [sphenix-sepd-l] sEPD handle/"Bike rack" schedules

sphenix-sepd-l AT lists.bnl.gov

Subject: sPHENIX Event Plane Detector discussion

List archive

Chronological Thread  
  • From: "Pontieri, Chris" <cpontieri AT bnl.gov>
  • To: "Ruggiero, Richard" <ruggiero AT bnl.gov>, Rosi Reed <rosijreed AT lehigh.edu>, "Feder, Russell" <rfeder AT bnl.gov>, "sphenix-sepd-l AT lists.bnl.gov" <sphenix-sepd-l AT lists.bnl.gov>
  • Subject: Re: [sphenix-sepd-l] sEPD handle/"Bike rack" schedules
  • Date: Tue, 21 Mar 2023 19:35:00 +0000

Rosi

I should have also added that the “bike racks” are being fabricated by Don Nostrand.  I will monitor the progress and get it out to your team as soon as it is complete.

 

Best Regards,

 

Christopher Pontieri
sPHENIX
Physics Department
Office: 631.344.5038
cpontieri AT bnl.gov

Twitter | Facebook | Instagram | LinkedIn

 

From: Pontieri, Chris
Sent: Tuesday, March 21, 2023 3:32 PM
To: Ruggiero, Richard <ruggiero AT bnl.gov>; Rosi Reed <rosijreed AT lehigh.edu>; Feder, Russell <rfeder AT bnl.gov>; sphenix-sepd-l AT lists.bnl.gov
Subject: RE: sEPD handle/"Bike rack" schedules

 

Carter has the hardware in hand, and will start laying out the holes this week.

 

Best Regards,

 

Christopher Pontieri
sPHENIX
Physics Department
Office: 631.344.5038
cpontieri AT bnl.gov

Twitter | Facebook | Instagram | LinkedIn

 

From: Ruggiero, Richard
Sent: Tuesday, March 21, 2023 3:27 PM
To: Rosi Reed <rosijreed AT lehigh.edu>; Feder, Russell <rfeder AT bnl.gov>; sphenix-sepd-l AT lists.bnl.gov
Cc: Pontieri, Chris <cpontieri AT bnl.gov>
Subject: RE: sEPD handle/"Bike rack" schedules

 

Hi Rosi,

                The handles need to be attached before the petals are attached. I spoke with Carter today and he has the drawing for the handle locations. Frank Toldo ordered the handles and associated hardware. He has them in 1008. I also asked Chris Pontieri (cc’d) if he could get those parts to Carter.

 

Attached are all the related drawings.

 

Rich

 

From: Rosi Reed <rosijreed AT lehigh.edu>
Sent: Tuesday, March 21, 2023 3:20 PM
To: Feder, Russell <rfeder AT bnl.gov>; sphenix-sepd-l AT lists.bnl.gov; Ruggiero, Richard <ruggiero AT bnl.gov>
Subject: sEPD handle/"Bike rack" schedules

 

Hi Russ/Rich,

We wanted to check on the time scales for the handle for the sEPD strongback and the "bike rack".  Other than our test fits with a single strongback petal, it doesn't make sense to assemble the strongback pieces until the holes are drilled into the petals and the "bike racks" exist.  We also will need to unassemble the one we have for the holes to be drilled.  It sounds like these activities are planned from talking to our sEPD crew, can you let us know what the timing is?

Rich - can you send around the final drawings for the handle?  One thing I did not know is whether there was a washer or anything that needed to go under the scintillator for this design.  Basically, there is the question if whether the handles can be added after the petal assembly or whether this is something that needed to happen prior to the entire assembly.

Regards,

Rosi


--

Rosi Reed
RHIC/AGS UEC member
Associate Professor, Physics Department
Lehigh University
(610)758-3907
16 Memorial Drive East Office 406
Bethlehem, PA 18015
she/her/hers