Hi Russ/Rich,
We wanted to check on the time scales for the handle for the sEPD strongback and the "bike rack".  Other than our test fits with a single strongback petal, it doesn't make sense to assemble the strongback pieces until the holes are drilled into the petals and the "bike racks" exist.  We also will need to unassemble the one we have for the holes to be drilled.  It sounds like these activities are planned from talking to our sEPD crew, can you let us know what the timing is?
Rich - can you send around the final drawings for the handle?  One thing I did not know is whether there was a washer or anything that needed to go under the scintillator for this design.  Basically, there is the question if whether the handles can be added after the petal assembly or whether this is something that needed to happen prior to the entire assembly.
Regards,
Rosi

--
Rosi Reed
RHIC/AGS UEC member
Associate Professor, Physics Department
Lehigh University
(610)758-3907
16 Memorial Drive East Office 406
Bethlehem, PA 18015
she/her/hers



Archive powered by MHonArc 2.6.24.

Top of Page