sphenix-software-l AT lists.bnl.gov
Subject: sPHENIX discussion of software
List archive
Re: [Sphenix-software-l] no software meeting today
- From: Xiaochun He <xhe AT gsu.edu>
- To: pinkenburg <pinkenburg AT bnl.gov>, "sphenix-software-l AT lists.bnl.gov" <sphenix-software-l AT lists.bnl.gov>
- Subject: Re: [Sphenix-software-l] no software meeting today
- Date: Wed, 30 Dec 2020 16:14:56 +0000
Dear Chris and all computing gurus,
This does seem to be a very good news. We all appreciate your hard work.
Happy new year,
Xiaochun
--
Xiaochun He
Regents Professor
Department of Physics & Astronomy
Georgia State University
Atlanta, GA 30303
Email: xhe AT gsu.edu
From: sPHENIX-software-l <sphenix-software-l-bounces AT lists.bnl.gov> on behalf of pinkenburg <pinkenburg AT bnl.gov>
Sent: Tuesday, December 29, 2020 12:06 PM
To: sphenix-software-l AT lists.bnl.gov <sphenix-software-l AT lists.bnl.gov>
Subject: [Sphenix-software-l] no software meeting today
Sent: Tuesday, December 29, 2020 12:06 PM
To: sphenix-software-l AT lists.bnl.gov <sphenix-software-l AT lists.bnl.gov>
Subject: [Sphenix-software-l] no software meeting today
Hi folks,
just to make it official - there is no software meeting today.
There was some progress and some problems for the mdc.
The good news is that Tony sped up the tpc sims, so they now should
succeed within their time limit (the first 250 were done within 12
hours). I'll start the tracking pass on them soon.
The old tpc sims (and tracking of them) are still available for crosschecks.
Dennis's pythia8 implementation was checked in and 10M MB events were
produced in HepMC format. Jin dug out the vertex distribution and rates
from our bup.
central hijing g4 sims are ongoing 655000 events so far.
The problem is dCache - the new version rcf installed doesn't work (many
files don't show up with find or ls which throws a monkey wrench into
the scripts). We are back using the PHENIX dCache which does this right
but has marginal throughput.
Happy new year
Chris
--
*************************************************************
Christopher H. Pinkenburg ; pinkenburg AT bnl.gov
; https://nam03.safelinks.protection.outlook.com/?url="http:%2F%2Fwww.phenix.bnl.gov%2F~pinkenbu&data=04%7C01%7Cxhe%40gsu.edu%7C4e5b5956446148fae23b08d8ac1cd739%7C515ad73d8d5e4169895c9789dc742a70%7C0%7C0%7C637448587159233150%7CUnknown%7CTWFpbGZsb3d8eyJWIjoiMC4wLjAwMDAiLCJQIjoiV2luMzIiLCJBTiI6Ik1haWwiLCJXVCI6Mn0%3D%7C1000&sdata=5w4MWfaAcNRy9AnpWKDQmUzNb82OMPbVJMMGepCa4wA%3D&reserved=0
Brookhaven National Laboratory ; phone: (631) 344-5692
Physics Department Bldg 510 C ; fax: (631) 344-3253
Upton, NY 11973-5000
*************************************************************
_______________________________________________
sPHENIX-software-l mailing list
sPHENIX-software-l AT lists.bnl.gov
https://nam03.safelinks.protection.outlook.com/?url="https%3A%2F%2Flists.bnl.gov%2Fmailman%2Flistinfo%2Fsphenix-software-l&data=04%7C01%7Cxhe%40gsu.edu%7C4e5b5956446148fae23b08d8ac1cd739%7C515ad73d8d5e4169895c9789dc742a70%7C0%7C0%7C637448587159233150%7CUnknown%7CTWFpbGZsb3d8eyJWIjoiMC4wLjAwMDAiLCJQIjoiV2luMzIiLCJBTiI6Ik1haWwiLCJXVCI6Mn0%3D%7C1000&sdata=bBD0zPQ%2FNPwrLRBOKp3G1X%2BbPTQwToElLeOjL6oBhzY%3D&reserved=0
just to make it official - there is no software meeting today.
There was some progress and some problems for the mdc.
The good news is that Tony sped up the tpc sims, so they now should
succeed within their time limit (the first 250 were done within 12
hours). I'll start the tracking pass on them soon.
The old tpc sims (and tracking of them) are still available for crosschecks.
Dennis's pythia8 implementation was checked in and 10M MB events were
produced in HepMC format. Jin dug out the vertex distribution and rates
from our bup.
central hijing g4 sims are ongoing 655000 events so far.
The problem is dCache - the new version rcf installed doesn't work (many
files don't show up with find or ls which throws a monkey wrench into
the scripts). We are back using the PHENIX dCache which does this right
but has marginal throughput.
Happy new year
Chris
--
*************************************************************
Christopher H. Pinkenburg ; pinkenburg AT bnl.gov
; https://nam03.safelinks.protection.outlook.com/?url="http:%2F%2Fwww.phenix.bnl.gov%2F~pinkenbu&data=04%7C01%7Cxhe%40gsu.edu%7C4e5b5956446148fae23b08d8ac1cd739%7C515ad73d8d5e4169895c9789dc742a70%7C0%7C0%7C637448587159233150%7CUnknown%7CTWFpbGZsb3d8eyJWIjoiMC4wLjAwMDAiLCJQIjoiV2luMzIiLCJBTiI6Ik1haWwiLCJXVCI6Mn0%3D%7C1000&sdata=5w4MWfaAcNRy9AnpWKDQmUzNb82OMPbVJMMGepCa4wA%3D&reserved=0
Brookhaven National Laboratory ; phone: (631) 344-5692
Physics Department Bldg 510 C ; fax: (631) 344-3253
Upton, NY 11973-5000
*************************************************************
_______________________________________________
sPHENIX-software-l mailing list
sPHENIX-software-l AT lists.bnl.gov
https://nam03.safelinks.protection.outlook.com/?url="https%3A%2F%2Flists.bnl.gov%2Fmailman%2Flistinfo%2Fsphenix-software-l&data=04%7C01%7Cxhe%40gsu.edu%7C4e5b5956446148fae23b08d8ac1cd739%7C515ad73d8d5e4169895c9789dc742a70%7C0%7C0%7C637448587159233150%7CUnknown%7CTWFpbGZsb3d8eyJWIjoiMC4wLjAwMDAiLCJQIjoiV2luMzIiLCJBTiI6Ik1haWwiLCJXVCI6Mn0%3D%7C1000&sdata=bBD0zPQ%2FNPwrLRBOKp3G1X%2BbPTQwToElLeOjL6oBhzY%3D&reserved=0
-
[Sphenix-software-l] no software meeting today,
pinkenburg, 12/29/2020
- Re: [Sphenix-software-l] no software meeting today, Xiaochun He, 12/30/2020
Archive powered by MHonArc 2.6.24.