Dear Yi,
I don't know of any reason why the T-board changes would require any change to the hybrids. (I guess it would be possible to modify connector location on the outer hybrid if there was a problem to accomodate the T-board mounting with the present location of the connector. But this doesn't seem to appropriate unless there is a conflicting requirement I haven't heard of.)
I also don't know of any other issues requiring changes to the
hybrids.
When do the hybrids have to be ordered to keep the schedule? (I am asking since there are still these questions about noise oddities, though I doubt they indicate any problem with the hybrid. Still, we're not done understanding the issues and can't really rule out any mitigating change to make on the hybrids.)
These are my opinions anyway. Zhenyu, Mike?
Sincerely,
Gerard
p.s. I think to finish the T-board design, some dimensional info is needed as I tried to explain.
On 8/18/2020 10:45 PM, Yi Yang wrote:
Dear Gerard,
Due to the tight schedule of the production, I am wondering if you think the updated hybrid is final or there is potential change due to the modification on T-board?
If it is final, it would be great that Jianing and Maowu can place the order. Thanks a lot.
Cheers,
Yi
-
[Star-fst-l] about final Hybrid,
Yi Yang, 08/18/2020
-
Re: [Star-fst-l] about final Hybrid,
Gerard Visser, 08/18/2020
-
Re: [Star-fst-l] about final Hybrid,
Yi Yang, 08/19/2020
- Re: [Star-fst-l] about final Hybrid, Gerard Visser, 08/19/2020
-
Re: [Star-fst-l] about final Hybrid,
Yi Yang, 08/19/2020
-
Re: [Star-fst-l] about final Hybrid,
Gerard Visser, 08/18/2020
Archive powered by MHonArc 2.6.24.