Dear Gerard,
Thanks a lot for the prompt reply. According to the schedule from SDU, it will take at least 4 weeks to finish the production and few days to test and ship to NCKU. So it would be great to place the order in these few days.
The dimensions can be found in Appendix C of the document: https://www.dropbox.com/s/cndffu9ybv8zkyu/Mechanical_Structure_for_FST_at_STAR_v2.pdf?dl=0
Cheers,
Yi
+++++++++++++++++++++++++++++++++++++++++++++++++++
Yi Yang, Associate Professor
Department of Physics
National Cheng Kung University
Tainan, 701 Taiwan
E-Mail: yiyang AT ncku.edu.tw
Tel: +886-6-2757575 ext.65237
Fax: +886-6-2747995
Group Web: http://phys.ncku.edu.tw/~yiyang
+++++++++++++++++++++++++++++++++++++++++++++++++++
Yi Yang, Associate Professor
Department of Physics
National Cheng Kung University
Tainan, 701 Taiwan
E-Mail: yiyang AT ncku.edu.tw
Tel: +886-6-2757575 ext.65237
Fax: +886-6-2747995
Group Web: http://phys.ncku.edu.tw/~yiyang
+++++++++++++++++++++++++++++++++++++++++++++++++++
On Wed, Aug 19, 2020 at 10:59 AM Gerard Visser <gvisser AT indiana.edu> wrote:
Dear Yi,
I don't know of any reason why the T-board changes would require any change to
the hybrids. (I guess it would be possible to modify connector location on the
outer hybrid if there was a problem to accomodate the T-board mounting with the
present location of the connector. But this doesn't seem to appropriate unless
there is a conflicting requirement I haven't heard of.)
I also don't know of any other issues requiring changes to the hybrids.
When do the hybrids have to be ordered to keep the schedule? (I am asking since
there are still these questions about noise oddities, though I doubt they
indicate any problem with the hybrid. Still, we're not done understanding the
issues and can't really rule out any mitigating change to make on the hybrids.)
These are my opinions anyway. Zhenyu, Mike?
Sincerely,
Gerard
p.s. I think to finish the T-board design, some dimensional info is needed as I
tried to explain.
On 8/18/2020 10:45 PM, Yi Yang wrote:
> Dear Gerard,
>
> Due to the tight schedule of the production, I am wondering if you think the
> updated hybrid is final or there is potential change due to the modification on
> T-board?
>
> If it is final, it would be great that Jianing and Maowu can place the order.
> Thanks a lot.
>
> Cheers,
> Yi
-
[Star-fst-l] about final Hybrid,
Yi Yang, 08/18/2020
-
Re: [Star-fst-l] about final Hybrid,
Gerard Visser, 08/18/2020
-
Re: [Star-fst-l] about final Hybrid,
Yi Yang, 08/19/2020
- Re: [Star-fst-l] about final Hybrid, Gerard Visser, 08/19/2020
-
Re: [Star-fst-l] about final Hybrid,
Yi Yang, 08/19/2020
-
Re: [Star-fst-l] about final Hybrid,
Gerard Visser, 08/18/2020
Archive powered by MHonArc 2.6.24.